This study emphasises the importance of studying scenarios developed against common<br />
foundations to avoid distortions created by differences within the scenario rather than<br />
genuine market need. Both the radial and meshed approaches produce similar levels of<br />
interconnection, with similar associated production cost savings, although there are<br />
significant differences in how they were achieved (e.g. Norway-Great Britain link in the<br />
radial design is replaced by Norway-Germany and flows through Continental Europe in the<br />
meshed design). <strong>The</strong>se differences need to be further investigated.<br />
<strong>The</strong> addition of new offshore wind park connections and new interconnectors require<br />
reinforcement of the onshore grids to accommodate the increased power flows through<br />
the onshore networks. <strong>The</strong> onshore reinforcements are, with the exception of very small<br />
differences in Great Britain, of the same order in both the meshed and radial cases.<br />
Figure 0-5 Radial <strong>Grid</strong> Design for 2030, Reference Scenario 1<br />