- Page 1 and 2:
The North Seas Countries’ Offshor
- Page 3 and 4:
5.1.5 Comparison of Costs and Calcu
- Page 5 and 6:
Executive Summary Recognising the i
- Page 7 and 8:
Approach adopted The process adopte
- Page 9 and 10:
Figure 0-3 Comparison of installed
- Page 11 and 12:
Figure 0-6 Meshed Grid Design for 2
- Page 13 and 14:
1 Background and Context (Programme
- Page 15 and 16:
1.1.2 Statement of Aims and Objecti
- Page 17 and 18:
Scope The information contained wit
- Page 19 and 20:
facilities using other primary reso
- Page 21 and 22:
The results of this study compare t
- Page 23 and 24:
1.1.7 Scenario based planning and T
- Page 25 and 26:
2 Methodology Overview 2.1 Overview
- Page 27 and 28:
2.3 Market Modelling I System Adequ
- Page 29 and 30:
3 Development of the 2030 Hypothesi
- Page 31 and 32:
In the use of data it is important
- Page 33 and 34:
than a best view approach. A scenar
- Page 35 and 36:
3.4 Assumptions In addition to the
- Page 37 and 38:
Figure 3-6TYNDP Projects 2012 - 201
- Page 39 and 40:
References. All other generation /
- Page 41 and 42:
meets some portion of its demand us
- Page 43 and 44:
Figure 4-4 Import/Export Balance as
- Page 45 and 46:
5 Grid designs 5.1 Grid Configurati
- Page 47 and 48:
Figure 5-1 Radial Grid Design for 2
- Page 49 and 50:
5.1.1 Statistics for Grid Design Op
- Page 51 and 52:
5.1.2 Investment Costs for Grid Des
- Page 53 and 54:
CAPEX [€'m] 14,000 12,000 10,000
- Page 55 and 56:
CAPEX [€'m] 35,000 30,000 25,000
- Page 57 and 58:
5.1.4.1 Annual Production Cost Savi
- Page 59 and 60:
increased interconnection, coal-fir
- Page 61 and 62:
There is a large increase in gross
- Page 63 and 64:
The costs and the benefits for the
- Page 65 and 66:
Figure 5-16 : Map of OWP locations
- Page 67 and 68:
Figure 5-18 : Map of meshed grid de
- Page 69 and 70:
To provide an indication of total c
- Page 71 and 72:
6 Conclusions and Outlook 6.1 Discu
- Page 73 and 74:
Going forward, additional scenarios
- Page 75 and 76:
Therefore, if future targets are li
- Page 77 and 78:
Continuing this initiative will hel
- Page 79 and 80: A 1 Detailed Description of Methodo
- Page 81 and 82: Figure 7-2 High level Process overv
- Page 83 and 84: In particular, PEMMDB generation an
- Page 85 and 86: A 1.3 Grid Expansion Approach (Grid
- Page 87 and 88: Table 7-1: Summary of the Model Par
- Page 89 and 90: Technology choices that were consid
- Page 91 and 92: configurations that typically consi
- Page 93 and 94: A 2 NSCOGI reference scenario - det
- Page 95 and 96: A 2.2 Details by country- Belgium I
- Page 97 and 98: A 2.4 Details by country- France In
- Page 99 and 100: A 2.6 Details by country- Great Bri
- Page 101 and 102: A 2.8 Details by country- Luxembour
- Page 103 and 104: A 2.10 Details by country- Netherla
- Page 105 and 106: A 2.12 Details by country- Sweden I
- Page 107 and 108: A 3 Country specific comments The f
- Page 109 and 110: to the Netherlands are much lower,
- Page 111 and 112: A 3.2 Country-specific comments - D
- Page 113 and 114: For the meshed design, only the int
- Page 115 and 116: Interconnectors The total France -
- Page 117 and 118: The main RES+ Scenario challenge fo
- Page 119 and 120: connected directly to the shore. On
- Page 121 and 122: A 3.5 Country-specific comments - G
- Page 123 and 124: RES+ commentary The RES+ sensitivit
- Page 125 and 126: Table 7-6 Offshore Generation level
- Page 127 and 128: A 3.7 Country-specific comments - L
- Page 129: There are no overloads on the cross
- Page 133 and 134: Interconnectors The radial design i
- Page 135 and 136: In the meshed design the connection
- Page 137 and 138: A 5 Abbreviations ACER Agency for t
- Page 139 and 140: A 6 List of References Background M
- Page 141 and 142: National (Grid) Development Plans [