CAPEX [€'m]<br />

35,000<br />

30,000<br />

25,000<br />

20,000<br />

15,000<br />

10,000<br />

5,000<br />

RADIAL<br />

Network Design<br />

MESH<br />

Network Design<br />

-<br />

National Network<br />

Reinforcement<br />

National OWP<br />

Connection<br />

Interconnection Total<br />

8,573 13,524 8,757 30,855<br />

8,274 12,038 9,702 30,014<br />

Figure 5-10 Comparison of Radial and Meshed New Investment Costs by Country for 2030 Reference<br />

Scenario (additional to TYNDP projects)<br />

Figure 5-10 shows the breakdown of the investment costs into national reinforcements,<br />

the connection of the additional 13 GW of offshore wind park and new interconnections<br />

for both designs. This categorisation of capital costs into investment areas or types allows<br />

the concentration of spend to be assessed.<br />

In total, the meshed design has a capital cost of around 800 M€ (2,7%) less than that of<br />

the radial design. Both designs have similar requirements as to the national<br />

reinforcements; as may have been expected, the radial design has higher costs connecting<br />

offshore wind parks back to shore; while meshed has slightly higher offshore costs to<br />

accommodate some of the output from the offshore wind parks, reducing the requirement<br />

for direct connections of the offshore wind parks back to shore.<br />

<strong>The</strong> total capital costs for the radial and meshed network designs are represented in their<br />

corresponding annualised capital cost values in Table 5-1.<strong>The</strong> annuity values are based on<br />

the average real net discount rate of 6% and an assumed useful asset life of 40 years. <strong>The</strong><br />

rate and the period were seen to be comparable with those used by most of the TSOs<br />

across the <strong>North</strong> <strong>Seas</strong> countries. <strong>The</strong> discount rate is in real values (i.e. excludes inflation)<br />

and therefore allows constant values to be used.<br />

Table 5-1: Total and Annualised Investment Costs for Radial and Meshed Designs (additional to TYNDP<br />

projects)<br />

Investment Costs Radial Design<br />

Meshed design<br />

Total Investment Costs [M€] 30,855 30,014<br />

Annualised Investment Costs [M€ p.a.] 2,051 1,995<br />

Page 43 of 142