To provide an indication of total costs, the annual VOM costs are also included. <strong>The</strong><br />

capital costs were represented as annualised values in the same manner as used in the<br />

Reference Scenario, and are summarised in Table 5-5 below.<br />

Table 5-5 : Comparison of Annualised Investment and VOM Costs for radial and meshed grid design for<br />

RES+ sensitivity on the Reference Scenario<br />

National Network<br />

Reinforcement<br />

National OWPP<br />

Connection<br />

RADIAL Network Design MESH Network Design<br />

Capital<br />

Cost<br />

[M€p.a.]<br />

VOM<br />

[M€p.a.]<br />

Total<br />

[M€p.a.]<br />

Capital<br />

Cost<br />

[M€p.a.]<br />

VOM<br />

[M€p.a.]<br />

Page 57 of 142<br />

Total<br />

[M€p.a.]<br />

703 195 898 612 194 806<br />

2,328 591 2,919 1,987 456 2,443<br />

Interconnection 767 215 982 930 287 1,216<br />

Total 3,798 1,001 4,799 3,528 937 4,465<br />

Total Costs<br />

excluding radial<br />

OWPP connection<br />

costs<br />

1,880 1,546<br />

Excluding the costs of connecting the OWPPs (assuming the default is the radial network<br />

design), the annual costs for the radial design are 1,880 M€, whereas the meshed design<br />

costs are 1,546 M€.<br />

5.1.7 Operational Aspects<br />

Although not within the scope of this study, the operational aspects of an integrated<br />

meshed grid have to be considered. A number of studies have concluded that the<br />

operation of a meshed DC system is more complex than the known and proven radial<br />

design for connection of offshore wind farms and shore-to-shore interconnections. [30],<br />

[35].<br />

Although not necessarily necessary for the meshed designs presented in this report, new<br />

technologies, such as the commercial availability of a DC breaker should improve the<br />

operational challenge [36].