5.1.5 Comparison of Costs and Calculated Benefits of both <strong>Grid</strong><br />

Designs<br />

<strong>The</strong> comparison of costs and benefits between the radial and meshed grid designs is<br />

carried out using readily quantifiable values and as such is seen to be a narrow<br />

assessment of the relative merits of the options considered. <strong>The</strong> value associated with the<br />

non-quantifiable or less readily available costs and benefits are, for the purposes of this<br />

discussion, not considered.<br />

In accordance with the assumptions used and the agreed scope of the study, the level of<br />

wind generation and their geographical locations in 2030 have been stipulated and the<br />

evaluation is therefore focused on the comparison of network design options.<br />

<strong>The</strong> separate assessment of whether it is economic to connect the OWPPs as specified in<br />

the Reference Scenario for 2030, or what level of offshore wind generation is optimum, is<br />

not addressed in this evaluation. <strong>The</strong> starting position for this economic assessment is<br />

therefore that the specified OWPPs are deemed connected and costs associated with<br />

providing the OWPPs with connections need to be excluded from this assessment. <strong>The</strong><br />

default design configuration for the integration of the OWPPs was assumed using a radial<br />

design configuration. Under the exercise the simple approach was chosen to assume that<br />

the connection costs of the offshore wind parks in the radial case are the reference costs<br />

for connections applicable in both cases. <strong>The</strong>se costs are therefore subtracted from the<br />

totals of both designs.<br />

In reality, some wind parks in the meshed design will be connected partly through direct<br />

links to shore and partly through interconnectors, resulting in a possible reduction of<br />

connections to shore. By choosing to subtract the higher reference connection costs from<br />

the overall meshed design costs, the analysis takes account of this optimisation.<br />

As stated in Section 5.1.4, the benefits that were derived relate to all new grid build other<br />

than the connections of new generation and demand.<br />

<strong>The</strong> annualised values (annuities) associated with the two network designs are used to<br />

carry out the evaluation. This method is appropriate for the comparison of the relative<br />

economic position of competing alternatives. Given that the way the individual network<br />

designs will be developed is not known at this stage, this method allows the comparison<br />

of economic merits without addressing the issue of the phased development of the<br />

individual networks and the associated phasing of capital expenditure. As such, the<br />

method is suitable to compare competing alternatives, but should not be interpreted as a<br />

means of conducting an investment appraisal.<br />

In order to compare the capital investment costs of each grid design, presented in Section<br />

5.1.3, with the annual production cost savings calculated for 2030, it is necessary to<br />

express the costs as annuities. Full amortisation with an asset life of 40 years and a<br />

discount rate of 6% were assumed for this purpose.<br />