A 3.6 Country-specific comments – Ireland and <strong>North</strong>ern Ireland<br />
Reference Scenario<br />
Reference Scenario Radial Design Map<br />
Interconnectors<br />
Reference Scenario Meshed Design Map<br />
<strong>The</strong> existing Moyle Interconnector between <strong>North</strong>ern Ireland and Scotland and the recently<br />
commissioned East West Interconnector between Ireland and Wales were assumed to have<br />
import and export capacities of 500 MW. <strong>The</strong> Reference Scenario analysis identified the<br />
need for a 1 GW HVDC interconnector between <strong>North</strong>ern Ireland and Great Britain<br />
(Scotland) and another between Ireland and France. <strong>The</strong> main drivers were high imports<br />
from Great Britain and France, particularly when renewable generation levels were low and<br />
thermal plant was out of merit on the island. In Ireland the interconnection termination<br />
location was determined to be at the Great Island 400 kV station and in <strong>North</strong>ern Ireland<br />
at the Ballylumford 275 kV station. <strong>The</strong> interconnectors were accommodated without<br />
additional network reinforcement beyond what is already planned.<br />
In relation to the France- Ireland interconnector (1GW), a bilateral Eir<strong>Grid</strong>-RTE study is<br />
currently being carried out to assess other constraints (i.e. voltage constraints)<br />
<strong>Offshore</strong> Connections<br />
<strong>The</strong> assumed offshore generation levels and locations for the Ireland and <strong>North</strong>ern Ireland<br />
Reference Scenario were as outlined in the table below. Due to the relatively small size of<br />
the wind farms assumed in the scenario and the short distances from the existing onshore<br />
network, the optimisation analysis produced the same result for the radial and meshed<br />
network configurations. In summary, for the levels of offshore generation assumed in the<br />
Reference Scenario, all the offshore wind farm network connections could be realised with<br />
single HVAC radial connections.<br />
Page7-47