A 3.6 Country-specific comments – Ireland and <strong>North</strong>ern Ireland<br />

Reference Scenario<br />

Reference Scenario Radial Design Map<br />

Interconnectors<br />

Reference Scenario Meshed Design Map<br />

<strong>The</strong> existing Moyle Interconnector between <strong>North</strong>ern Ireland and Scotland and the recently<br />

commissioned East West Interconnector between Ireland and Wales were assumed to have<br />

import and export capacities of 500 MW. <strong>The</strong> Reference Scenario analysis identified the<br />

need for a 1 GW HVDC interconnector between <strong>North</strong>ern Ireland and Great Britain<br />

(Scotland) and another between Ireland and France. <strong>The</strong> main drivers were high imports<br />

from Great Britain and France, particularly when renewable generation levels were low and<br />

thermal plant was out of merit on the island. In Ireland the interconnection termination<br />

location was determined to be at the Great Island 400 kV station and in <strong>North</strong>ern Ireland<br />

at the Ballylumford 275 kV station. <strong>The</strong> interconnectors were accommodated without<br />

additional network reinforcement beyond what is already planned.<br />

In relation to the France- Ireland interconnector (1GW), a bilateral Eir<strong>Grid</strong>-RTE study is<br />

currently being carried out to assess other constraints (i.e. voltage constraints)<br />

<strong>Offshore</strong> Connections<br />

<strong>The</strong> assumed offshore generation levels and locations for the Ireland and <strong>North</strong>ern Ireland<br />

Reference Scenario were as outlined in the table below. Due to the relatively small size of<br />

the wind farms assumed in the scenario and the short distances from the existing onshore<br />

network, the optimisation analysis produced the same result for the radial and meshed<br />

network configurations. In summary, for the levels of offshore generation assumed in the<br />

Reference Scenario, all the offshore wind farm network connections could be realised with<br />

single HVAC radial connections.<br />