discharge chute <strong>of</strong> the drier in order to record automatically the temperature <strong>of</strong> the asphaltic<br />

concrete or mineral aggregate. A copy <strong>of</strong> the recording shall be given to the Engineer at the<br />

end <strong>of</strong> each shift.<br />

The moisture content <strong>of</strong> the asphaltic concrete shall not exceed 0.5 percent. The moisture<br />

content will be determined in accordance with Arizona Test Method 406. Drying and<br />

heating shall be accomplished in such a manner as to preclude the mineral aggregate from<br />

becoming coated with fuel oil or carbon.<br />

413-7.05 Mixing:<br />

The production <strong>of</strong> the plant shall be governed by the rate required to obtain a thorough and<br />

uniform mixture <strong>of</strong> the materials.<br />

A positive signal system shall be provided to indicate the low level <strong>of</strong> mineral aggregate in<br />

the bins. The plant will not be permitted to operate unless this signal system is in good<br />

working condition. Each bin shall have an overflow chute or a divider to prevent material<br />

from spilling into adjacent bins.<br />

The temperature <strong>of</strong> asphaltic concrete upon discharge from the mixer shall not exceed<br />

350 degrees F. If the asphaltic concrete is discharged from the mixer into a hopper, the<br />

hopper shall be constructed so that segregation <strong>of</strong> the asphaltic concrete will be minimized.<br />

413-7.06 Placing and Finishing:<br />

(A) General Requirements:<br />

The handling <strong>of</strong> asphaltic concrete shall at all times be such as to minimize segregation.<br />

Any asphaltic concrete which displays segregation shall be removed and replaced.<br />

Before asphaltic concrete is placed, the surface to be paved shall be cleaned <strong>of</strong> all<br />

objectionable material and tacked with asphalt cement in accordance with the requirements<br />

<strong>of</strong> Section 404 <strong>of</strong> the specifications. The cleaning <strong>of</strong> the surface, the tacking <strong>of</strong> the surface,<br />

and the amount and grade <strong>of</strong> asphalt cement used shall be as directed by and acceptable to<br />

the Engineer.<br />

A light coat <strong>of</strong> asphalt cement shall be applied as directed to edges or vertical surfaces<br />

against which asphaltic concrete is to be placed.<br />

The base or subgrade upon which the asphaltic concrete is to be placed shall be prepared<br />

in accordance with the applicable requirement for the material involved and maintained in a<br />

smooth and firm condition until placement. <strong>Asphalt</strong>ic concrete shall not be placed on a<br />

frozen or excessively wet base or subgrade.<br />

<strong>Asphalt</strong>ic concrete shall be placed only when the temperature <strong>of</strong> the surface on which the<br />

asphaltic concrete is to be placed is at least 65 degrees F and the ambient temperature is at<br />

least 65 degrees F and rising. The placement shall be stopped when the ambient<br />

temperature is at or below 70 degrees F and falling.<br />

112