8.2 Construction <strong>of</strong> <strong>Asphalt</strong> <strong>Rubber</strong> Chip Seal Interlayer<br />

Table 11 shows the construction related project information for the <strong>Asphalt</strong> <strong>Rubber</strong> Chip Seal<br />

Interlayers used by different agencies.<br />

Table 11. Requirement during <strong>Asphalt</strong> <strong>Rubber</strong> Chip Seal Interlayer Construction<br />

Agency Ambient/pavement<br />

temperature<br />

California/Caltrans Pavement ≥ 13 o C<br />

(55 o F); The ambient<br />

air temperature<br />

should be 16-43°C<br />

(61-109F).<br />

Binder<br />

Temperature<br />

The binder<br />

application<br />

temperature<br />

is 196-213°C<br />

(385-415 o F).<br />

Chip Rock<br />

Temperature<br />

Chip application<br />

temperatures107-<br />

163°C (225-<br />

325F).<br />

Compaction<br />

Minimum <strong>of</strong><br />

one complete<br />

coverage with<br />

one or more<br />

pneumatictired<br />

rollers<br />

and shall<br />

begin within<br />

90 seconds<br />

following the<br />

placement <strong>of</strong><br />

the screenings.<br />

Distance<br />

between the<br />

rollers and the<br />

screenings<br />

spreader shall<br />

not exceed 60<br />

m.<br />

A minimum <strong>of</strong><br />

3 complete<br />

coverages.<br />

Sweeping shall<br />

be a multi-step<br />

operation.<br />

20