3. In addition to those samples taken for ERS compliance, five samples <strong>of</strong> 20 kg each <strong>of</strong> the<br />

OGFC, RAC-O, and OBC mixes. Labelling shall include which test section the mix is from.<br />

Chris Raymond<br />

Bituminous Section, MERO<br />

Room 15, Building C<br />

1201 Wilson Ave,<br />

Toronto, ON M3M 1J8<br />

Test Sections Layout<br />

The Contractor shall construct the test sections each two lanes wide and 500 meters long including<br />

partially or fully paved shoulders, as specified. The test sections shall be constructed in conformance<br />

with OPSS 313, as amended by the special provisions in this Contract and to the lines, grades,<br />

thicknesses and cross-sections shown elsewhere in the Contract Documents.<br />

The test sections shall be constructed in accordance with Table B indicating test section locations,<br />

thickness, and type <strong>of</strong> hot mix asphalt within each test section.<br />

Table B: Test Section Locations<br />

Test<br />

Section<br />

A Sta. 12+000 to Sta. 12+500<br />

Location Mix Thickness and Type<br />

30 mm OGFC over 50 mm HL4 OBC<br />

over 50 mm Superpave 19.0<br />

B Sta. 12+500 to Sta. 13+000 30 mm OGFC over 50 mm Superpave 19.0<br />

C Sta. 13+000 to Sta. 13+500 30 mm RAC-O over 50 mm Superpave 19.0<br />

D Sta. 13+500 to Sta. 14+000 30 mm SMA 9.5 over 50 mm Superpave 19.0<br />

E Sta. 14+000 to Sta. 14+500 40 mm SP 12.5 FC2 over 50 mm Superpave 19.0<br />

Each test section shall be constructed as shown in the schematic Test Section Layout below.<br />

Test Section Layout<br />

Section Limit 500 meters Section<br />

Limit<br />

Sampling<br />

Area<br />

Monitoring Portion<br />

Sampling<br />

Area<br />

150 m 200 m 150 m<br />

53