Mineral admixture will be measured by the ton.<br />

413-9 Basis <strong>of</strong> Payment:<br />

The accepted quantities <strong>of</strong> asphaltic concrete, measured as provided above, will be paid for<br />

at the contract unit price per ton, which price shall be full compensation for the work,<br />

complete in place, as specified herein.<br />

Payment for the asphalt-rubber will be made by the ton, including asphalt cement and<br />

crumb rubber. The results <strong>of</strong> a nuclear asphalt content gauge shall not be used to<br />

determine the weight <strong>of</strong> asphalt-rubber material as the basis <strong>of</strong> payment.<br />

Payment for mineral admixture will be made by the ton.<br />