28.03.2013 Views

Summary of Rubber Modified Asphalt Product Specifications around ...

Summary of Rubber Modified Asphalt Product Specifications around ...

Summary of Rubber Modified Asphalt Product Specifications around ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.2 Construction <strong>of</strong> <strong>Asphalt</strong> <strong>Rubber</strong> Chip Seals<br />

There are weather and other requirements for asphalt rubber chip seal applications that must be<br />

followed to ensure a successful product. Table 9 shows that the application normally requires a<br />

high binder application temperature and hot coated aggregate. California has found that<br />

precoating the aggregate will increase the bonding and rock retention.<br />

Table 9. Requirement during <strong>Asphalt</strong> <strong>Rubber</strong> Chip Seal Construction by Agencies<br />

Agency Ambient/pavement<br />

temperature<br />

California/Caltrans Pavement ≥ 13 o C<br />

(55 o F); The ambient<br />

air temperature<br />

should be 16-43°C<br />

(60-110F).<br />

Arizona DOT Ambient and<br />

pavement surface<br />

temperatures ≥<br />

24C (75 o F).<br />

Binder<br />

Temperature<br />

The binder<br />

application<br />

temperature<br />

is 196-213°C<br />

(385-415 o F).<br />

Chip Rock<br />

Temperature<br />

Chip application<br />

temperatures107-<br />

163°C (225-<br />

325F).<br />

Chip rock<br />

application<br />

temperature ≥<br />

121C (250 o F).<br />

Compaction<br />

Minimum <strong>of</strong><br />

one complete<br />

coverage with<br />

one or more<br />

pneumatictired<br />

rollers<br />

shall begin<br />

within 90<br />

seconds<br />

following the<br />

placement <strong>of</strong><br />

the screenings.<br />

Distance<br />

between the<br />

rollers and the<br />

screenings<br />

spreader shall<br />

not exceed 60<br />

m.<br />

A minimum <strong>of</strong><br />

3 complete<br />

coverages.<br />

Sweeping shall<br />

be a multi-step<br />

operation.<br />

Rolling is<br />

important.<br />

Shall use three<br />

pneumatic<br />

rollers.<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!