criteria outlined in Table C will be considered rejectable and shall be removed and replaced with an<br />

acceptable OGFC mix.<br />

Acceptance <strong>of</strong> RAC-O<br />

RAC-O shall meet the requirements for surface tolerance and visual acceptance as specified elsewhere<br />

in the Contract. Acceptance <strong>of</strong> the material shall be based on the average for the lot meeting the<br />

requirements given in Table C and for air voids, no less than 2 % below the mix design requirements.<br />

No payment adjustment will apply to the mix that meets the criteria. No payment adjustment will apply<br />

to the mix that meets the criteria. Any sublot that does not meet the criteria outlined in Table C will be<br />

considered rejectable and shall be removed and replaced with an acceptable RAC-O mix. No particles<br />

or clumps <strong>of</strong> CRM shall be visible to the naked eye.<br />

Acceptance <strong>of</strong> HL4 OBC<br />

OBC shall meet the requirements for surface tolerance and visual acceptance as specified elsewhere in<br />

the Contract. Acceptance <strong>of</strong> the material shall be based on the average for the lot meeting the<br />

requirements given in Table C and for air voids, no less than 2 % below the mix design requirements.<br />

No payment adjustment will apply to the mix that meets the criteria. No payment adjustment will apply<br />

to the mix that meets the criteria. Any sublot that does not meet the criteria outlined in Table C will be<br />

considered rejectable and shall be removed and replaced with an acceptable HL4 OBC mix.<br />

Referee Testing<br />

Table C - Specification Limits from Job Mix Formula (JMF)<br />

TEST LL (%) UL (%)<br />

<strong>Asphalt</strong> Cement Content JMF - 0.5 JMF + 0.50<br />

Designated Large Sieve* JMF - 5.0 JMF + 5.0<br />

4.75 mm Sieve JMF - 5.0 JMF + 5.0<br />

75 µm Sieve JMF - 1.0 JMF + 1.0<br />

* Designated Large Sieve is 4.75 mm for OGFC and RAC-O and is 9.5 mm for OBC.<br />

Testing by an independent third party referee laboratory <strong>of</strong> only the entire lot may be requested by the<br />

Contractor or the Owner for any completed lot.<br />

Referee testing for a given lot can only be invoked by the Contractor within five business days <strong>of</strong> the<br />

Contractor receiving the Contract Administrator’s calculated QC and QA payment factors for that lot.<br />

The Owner may invoke referee testing for a given lot not more than 15 business days after all the QA<br />

samples for the lot are received at the QA laboratory, or not more than 6 business days after all the QC<br />

results are received by the Contract Administrator, or not more than 15 days after a lot is terminated due<br />

to a delay <strong>of</strong> more than 20 business days in placing the complete lot, whichever is the latest date.<br />