28.03.2013 Views

Summary of Rubber Modified Asphalt Product Specifications around ...

Summary of Rubber Modified Asphalt Product Specifications around ...

Summary of Rubber Modified Asphalt Product Specifications around ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 7. Construction Requirement for Open-Graded <strong>Rubber</strong> <strong>Modified</strong> <strong>Asphalt</strong><br />

Agency Compaction<br />

and Air<br />

Void<br />

California Method spec,<br />

three rollers.<br />

Ambient/Pavement<br />

Temperature<br />

Above 13-18 o C (55-<br />

65 o F)<br />

Arizona Pavement temp ≥<br />

30 o C (85 o F)<br />

Texas Pavement temp ≥<br />

21 o C (70 o F)<br />

New<br />

Jersey<br />

MTO,<br />

Ontario,<br />

Canada<br />

Pavement temp ≥<br />

10 o C (50 o F)<br />

Air temperature >=<br />

12 C (54F). If<br />

ambient temperature<br />

is below 18C (65F),<br />

the hauling truck shall<br />

use a tarpaulin.<br />

Mix<br />

<strong>Product</strong>ion<br />

Temperatures<br />

Mixing<br />

temperatures:<br />

149-163 o C<br />

(300-325 o C)<br />

Discharge<br />

temperature from<br />

mixer ≤ 180 o C<br />

(350 o F)<br />

Discharge<br />

temperature from<br />

mixer ≤ 180 o C<br />

(350 o F)<br />

Compaction<br />

Temperatures<br />

Spread<br />

Temperature<br />

143-163 o C<br />

(290-325 o F);<br />

Breakdown<br />

starts ≥138 o C<br />

(280 o F) and<br />

ends ≥ 127 o C<br />

(260 o F)<br />

Breakdown<br />

starts ≥ 135C<br />

(275 o F)<br />

Spread<br />

temperature<br />

≥138 o C (280 o F)<br />

Laydown<br />

temperature<br />

135-165 o C<br />

(275-330 o F)<br />

Other<br />

Pneumatic<br />

tired rollers<br />

not allowed;<br />

Sand shall be<br />

applied.<br />

Roller steel<br />

wheels shall<br />

be wetted<br />

with water,<br />

or soapy<br />

water, or an<br />

approved<br />

product.<br />

Static roller;<br />

keep the<br />

wheels<br />

moistened<br />

with water<br />

mixed with<br />

detergent.<br />

Using lime<br />

water to<br />

prevent<br />

material<br />

pickup by<br />

traffic.<br />

Only steelwheeled<br />

rollers<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!