19XR (PIC II) Hermetic Centrifugal Liquid Chillers 50 Hz - Carrier
19XR (PIC II) Hermetic Centrifugal Liquid Chillers 50 Hz - Carrier
19XR (PIC II) Hermetic Centrifugal Liquid Chillers 50 Hz - Carrier
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
INITIAL START-UP CHECKLIST FOR <strong>19XR</strong> HERMETIC CENTRIFUGAL LIQUID CHILLERS<br />
Name: _____________________________________________________________________________________________<br />
Address: ____________________________________________________________________________________________<br />
Town: ______________________________________________________________________________________________<br />
Country: ____________________________________________________________________________________________<br />
Post code: ___________________________________________________________________________________________<br />
Job No.: _____________________________________________________________________________________________<br />
Model: ______________________________________________________________________________________________<br />
Serial No.: ____________________________________________________________________________________________<br />
Design conditions:<br />
Evaporator<br />
Condenser<br />
Cooling Brine Flow Temperature Temperature Pressure Pass Suction Condensing<br />
capacity rate in out drop temperature temperature<br />
Compressor: Volts _______________________ RLA: _______________________ OLTA: __________________<br />
Starter: Mfg ________________________ Type: _______________________<br />
Oil pump: Volts _______________________ RLA: _______________________ OLTA: __________________<br />
Control/oil heater: 115 Volts ___________ 230 Volts ___________<br />
Refrigerant: Type _______________ Charge (kg) __________<br />
<strong>Carrier</strong> obligations:<br />
Assemble: Yes ________ No ________<br />
Leak test: Yes ________ No ________<br />
Dehydrate: Yes ________ No ________<br />
Charging: Yes ________ No ________<br />
Operating instructions: ____________ Hours<br />
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS<br />
Job data required:<br />
1. Machine installation instructions <strong>19XR</strong> Yes ________ No ________<br />
2. Machine assembly, wiring and piping diagrams Yes ________ No ________<br />
3. Starting equipment details and wiring diagrams Yes ________ No ________<br />
4. Applicable design data (see above) Yes ________ No ________<br />
5. Diagrams and instructions for special controls Yes ________ No ________<br />
Initial machine pressure: __________________<br />
Was machine tight? Yes ________ No ________<br />
If not, were leaks corrected? Yes ________ No ________<br />
Was machine dehydrated after repairs? Yes ________ No ________<br />
Check oil level and record:<br />
Add oil: Yes ________ No ________<br />
Amount: ___________________________<br />
_______ 3/4 _______ 3/4<br />
_______ 1/2 Top sight glass _______ 1/2 Bottom sight glass<br />
_______ 1/4 _______ 1/4<br />
Record pressure drops:<br />
Evaporator ________________ Condenser ________________<br />
Refrigerant charge:<br />
Initial charge _______________ Final charge after trim ______________<br />
5