10.04.2013 Views

19XR (PIC II) Hermetic Centrifugal Liquid Chillers 50 Hz - Carrier

19XR (PIC II) Hermetic Centrifugal Liquid Chillers 50 Hz - Carrier

19XR (PIC II) Hermetic Centrifugal Liquid Chillers 50 Hz - Carrier

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INITIAL START-UP CHECKLIST FOR <strong>19XR</strong> HERMETIC CENTRIFUGAL LIQUID CHILLERS<br />

Name: _____________________________________________________________________________________________<br />

Address: ____________________________________________________________________________________________<br />

Town: ______________________________________________________________________________________________<br />

Country: ____________________________________________________________________________________________<br />

Post code: ___________________________________________________________________________________________<br />

Job No.: _____________________________________________________________________________________________<br />

Model: ______________________________________________________________________________________________<br />

Serial No.: ____________________________________________________________________________________________<br />

Design conditions:<br />

Evaporator<br />

Condenser<br />

Cooling Brine Flow Temperature Temperature Pressure Pass Suction Condensing<br />

capacity rate in out drop temperature temperature<br />

Compressor: Volts _______________________ RLA: _______________________ OLTA: __________________<br />

Starter: Mfg ________________________ Type: _______________________<br />

Oil pump: Volts _______________________ RLA: _______________________ OLTA: __________________<br />

Control/oil heater: 115 Volts ___________ 230 Volts ___________<br />

Refrigerant: Type _______________ Charge (kg) __________<br />

<strong>Carrier</strong> obligations:<br />

Assemble: Yes ________ No ________<br />

Leak test: Yes ________ No ________<br />

Dehydrate: Yes ________ No ________<br />

Charging: Yes ________ No ________<br />

Operating instructions: ____________ Hours<br />

START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS<br />

Job data required:<br />

1. Machine installation instructions <strong>19XR</strong> Yes ________ No ________<br />

2. Machine assembly, wiring and piping diagrams Yes ________ No ________<br />

3. Starting equipment details and wiring diagrams Yes ________ No ________<br />

4. Applicable design data (see above) Yes ________ No ________<br />

5. Diagrams and instructions for special controls Yes ________ No ________<br />

Initial machine pressure: __________________<br />

Was machine tight? Yes ________ No ________<br />

If not, were leaks corrected? Yes ________ No ________<br />

Was machine dehydrated after repairs? Yes ________ No ________<br />

Check oil level and record:<br />

Add oil: Yes ________ No ________<br />

Amount: ___________________________<br />

_______ 3/4 _______ 3/4<br />

_______ 1/2 Top sight glass _______ 1/2 Bottom sight glass<br />

_______ 1/4 _______ 1/4<br />

Record pressure drops:<br />

Evaporator ________________ Condenser ________________<br />

Refrigerant charge:<br />

Initial charge _______________ Final charge after trim ______________<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!