27.04.2013 Views

Control of Volatile Organic Compounds Emissions from Manufacturing

Control of Volatile Organic Compounds Emissions from Manufacturing

Control of Volatile Organic Compounds Emissions from Manufacturing

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LIST OF FIGURES<br />

Simplified Process Block Diagram for the<br />

Polypropylene Continuous. Liquid Phase<br />

Slurry Process .................. 2-7<br />

Page<br />

Simplified Process Block Diagram for the<br />

High Density Polyethylene Liquid Phase<br />

Slurry Process .................. 2-15<br />

Simplified Process Block Diagram for the<br />

Polystyrene Continuous Process ........... 2-21<br />

Steam Assisted Elevated Flare System ......... 3-4<br />

Steam Injection Flare Tip .............. 3-5<br />

Di screte Burner Thermal Inci nerator .........<br />

Distributed Burner Thermal Incinerator ........<br />

Catalytic Incinerator ................<br />

Condensation System .................<br />

Two Stage Regenerative Adsorption System ......<br />

Packed Tower for Gas Absorption ........ ;..<br />

Flare Sampling and Analysis System .........<br />

Schematic <strong>of</strong> Incineration System at ARC0<br />

Polypropylene Facility ..............<br />

Incinerator Combustion Chamber ...........<br />

Petro-Tex 0x0 Unit Incinerator ...........<br />

Off-gas Incinerator. Monsanto Co.,<br />

Chocolate Bayou Plant ...............<br />

Thermal Incinerator Stack Sampling System ......<br />

Estimated Flare Purchase Cost for 40.ft . Height ...<br />

Approximate Fluidic Seal Costs ...........<br />

Purchase Costs for Thermal Incinerator Combustion<br />

Chambers .....................<br />

Installed Capital Costs for Inlet Ducts. Waste Gas<br />

and Combustion Air Fans. and Stack for Thermal<br />

Incinerator Systems with No Heat Recovery ......<br />

Instal led Capital Costs for Catalytic Incinerators<br />

With and Without Heat Recovery ...........<br />

Installed Capital Cost vs . Condenser Area for<br />

Various Materials <strong>of</strong> Construction for a<br />

Complete Condenser Section .............<br />

Installed Capital Costs vs . Refrigeration Capacity<br />

at Various Coolant Temperatures for a Complete .<br />

Condenser Section .................<br />

x i

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!