Table E-3. CAPITAL AND ANNUAL OPERATING COST ESTIMATION PROCEDURE FOR'<br />

STEAM-ASSISTED SMOKELESS FLARES<br />

- - Y 1 l I _ l - r - - - - - P m - - - - - - - - - --=,,----~.--=d?lr;a---=<br />

I<br />

1<br />

Item Val ue<br />

1<br />

I<br />

Capital Costs<br />

Flare- ourchase cost. C1 ' ~1 Select <strong>from</strong> Table E-2 if val ue given'<br />

r-- - I I<br />

(Oct. 1982 $)<br />

or use equations:<br />

(3905.7) + (35#.054) H x D + (900.36) D.<br />

- (126.08)~2, fair 20 ( H 5 40 ft and D < 8 in.<br />

(6275.6) + (2214.10) H -i-(12.782) H x D<br />

+ (24.856)~2, for 50 5 H 5 200 ft.<br />

or <strong>from</strong> Figure E:-2 if H = 40 ft and D > 8 in.<br />

I<br />

I I<br />

I<br />

Fluidic seal purchase cost, C1 'fl.s. See footnote a.<br />

(Oct. 1982 $)<br />

Flare system purchase cost, C1'fl C"lf1 + C1"fl ,,s.<br />

Flare installed cost, ~ . ' . ~ 1 - C1 ' fl x 2.65<br />

(Oct. 1982 $1<br />

Total installed piping costs, C', Method <strong>of</strong> Appendix E .6<br />

(Aug. 1978 $)-<br />

Total instal 1 ed ducting costs, C1d Method <strong>of</strong> Appendix E .6 - *<br />

(Dec. 1977 $)<br />

I 1 1<br />

June 1980 Installed costs<br />

. .-<br />

Total flare system cost, (Cp + cd + cfl)<br />

Csvs<br />

~Ill<br />

I<br />

I<br />

I<br />

I<br />

I