27.04.2013 Views

Control of Volatile Organic Compounds Emissions from Manufacturing

Control of Volatile Organic Compounds Emissions from Manufacturing

Control of Volatile Organic Compounds Emissions from Manufacturing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table E-16. CAPITAL AND ANNUAL OPERATING COST ESTIMATION<br />

PROCEDURE FOR CONDENSERS WITH REFRIGERATION<br />

Item<br />

Ca ital Costs<br />

-+KEm<br />

Installed cost, Dec. 1979<br />

Inst a1 1 ed cost , June 1980a<br />

Instal led retr<strong>of</strong>it cost, June 1980<br />

Refrigeration<br />

Installed cost, Dec. 1979<br />

Installed cost, June 1980a<br />

Total Instal led Cost, June 1980<br />

Annual ized cosIkC<br />

Operating 1 abord<br />

Mai ntenance materi a1 s & 1 abor<br />

r .<br />

Utilities<br />

Electricity, pumping<br />

Electricity, refrigeration<br />

Coolant, make-up<br />

Capital recoveryh<br />

Taxes, administration<br />

& insurance<br />

Tot a1 annual ized cost<br />

without recovery credit<br />

Styrene recovery credit<br />

Net Annual ized Cost<br />

after recovery credit<br />

Value<br />

From Figure E-6 for A<br />

Instal led cost, Dec. 1979 x 1.O47<br />

Installed cost, June 1980 x 1.065,<br />

<strong>from</strong> Table 5-2<br />

From Fig. E-7 for RC & T~~<br />

Installed cost, Dec. 1979 x 1.047<br />

Sum <strong>of</strong> condenser and refrigeration<br />

$1,080<br />

0.05 x total installed cost<br />

See footnote e<br />

See footnote f<br />

See footnote g<br />

0.1627 x total installed cost<br />

0.04 x total installed cost<br />

Operating labor & maintenance<br />

+ utilities + capital recovery<br />

+ taxes, admi ni st ration &<br />

insurance<br />

2767 x Ws x (%Red'n. + 100)<br />

Total annualized cost - styrene<br />

recovery credit

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!