27.04.2013 Views

Control of Volatile Organic Compounds Emissions from Manufacturing

Control of Volatile Organic Compounds Emissions from Manufacturing

Control of Volatile Organic Compounds Emissions from Manufacturing

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 5-3. ANNUALIZED COST FACTORS FOR POLYMERS AND RESINS CTG<br />

(June 1980 Do1 lars)<br />

--.<br />

Direct Cost Factors<br />

Operating 1abor price: $18/hr (i ncl udi ng overhead)a<br />

Operati ng 1abor requi rements (i ncl udi ng. supervi sory 1 abor) :<br />

= 1200 1 abor hourslyr for thermal incinerator<br />

without heat recoveryb<br />

= 620 1abor hourslyr for fl areC<br />

= 60 1 abor hourslyr for condensed<br />

= 620 labor hourslyr for catalytic incinerator<br />

without heat recoveryc<br />

El ectrici ty price: $0.049/kwhe<br />

Natural gas price: $5.67165 ($5.98/~~~tu)f<br />

, # ,<br />

Steam price: $13.62/Mg ($6.18/1000 1 b)S<br />

Uater price: $0 .079/m3 ($0.3O/lOOO gal lh<br />

Styrene recovery credit: $0.788/kg ($0.357/l b)i<br />

Indi rect Cost Factors<br />

4<br />

Interest rates: I<br />

I<br />

10 percent (in the absence <strong>of</strong> taxes)<br />

I<br />

Equipment life, ~ : j<br />

i<br />

15 years for flare<br />

10 years for thermal incinerator, catalytic inc~inerator,<br />

condenser, pi pi ng<br />

!<br />

Capital recovery charge factor = yl<br />

= 0.131 for flare<br />

= 0.163 for thermal incinerator, catalytic irici nerator,<br />

condenser, pi pi ng<br />

I I<br />

Taxes, insurance, and administration: 0.04 x Total instal 1 ed capital cdstk<br />

I i<br />

Maintenance cost: 0.05 x Total install ed capital c:ostl<br />

I<br />

I<br />

Operating hours: 8000 hours/yr<br />

I<br />

I<br />

4<br />

I<br />

I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!