to aggressive deadlines on project performance through adding new tasks. Figure 11 shows the<br />

behavior of two projects (A and B) with different deadlines and, therefore, different amounts of<br />

schedule pressure. Without schedule pressure (feedback loop R2 inactive), the two projects<br />

finish in 25 weeks. The expected duration for project A has been reduced by 20% (20 weeks<br />

instead of 25 weeks). Project B has had its expected duration reduced by 28% (18 weeks). The<br />

interaction of schedule pressure and the tipping point have a dramatic impact on project<br />

performance. Project A remains on the improving side of the tipping point and finishes, but<br />

schedule pressure pushes Project B past the tipping point, causes trajectory reversal, and leads<br />

to failure. Simulations verify that the amount of schedule pressure that can be absorbed without<br />

trajectory reversal is related to the distance the project starts away from its tipping point<br />

conditions. These simulations demonstrate that projects can absorb safely some schedule<br />

pressure, but that in the presence of a tipping point structure, too much schedule pressure can<br />

cause projects to fail. The added new tasks–schedule pressure reinforcing loop provides an<br />

endogenous explanation for how projects that begin in conditions that can lead to success can<br />

become trapped beyond the tipping point, degrade, and fail.<br />

Total Backlog<br />

Total Backlog<br />

as a<br />

as<br />

Fraction<br />

a fraction<br />

of<br />

of<br />

Intial<br />

initial<br />

Scope<br />

scope<br />

(t)<br />

(t)<br />

2<br />

1.8<br />

1.6<br />

1.4<br />

1.2<br />

1<br />

0.8<br />

0.6<br />

0.4<br />

0.2<br />

0<br />

Project B: Expected project duration of 28% pushes the<br />

project over the tipping point and leads to failure.<br />

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2<br />

Total Backlog as a Fraction of Initial Scope (t-1)<br />

Projects begins below the tipping<br />

point.<br />

Project A: 20% decrease in expected project<br />

duration still alows the project to finish.<br />

Figure 11. Effect of Schedule Pressure on Project Performance Mode<br />

Compound Project Failure<br />

Most development projects experience temporary problems, and many have aggressive<br />

deadlines. In these cases, as shown above, development projects can be doomed or likely to<br />

fail due to a tipping point structure. However, projects that can succeed despite temporary<br />

problems but do not are of particular interest to development project managers because they<br />

=<br />

=<br />

==================^Åèìáëáíáçå=oÉëÉ~êÅÜW=ÅêÉ~íáåÖ=ëóåÉêÖó=Ñçê=áåÑçêãÉÇ=ÅÜ~åÖÉ=======- 355 -<br />

=<br />

=

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!