02.08.2013 Views

ECL Comfort 210/310, A275/A375 Installation Guide - Danfoss ...

ECL Comfort 210/310, A275/A375 Installation Guide - Danfoss ...

ECL Comfort 210/310, A275/A375 Installation Guide - Danfoss ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Installation</strong> <strong>Guide</strong> <strong>ECL</strong> <strong>Comfort</strong> <strong>210</strong> / <strong>310</strong>, application <strong>A275</strong> / <strong>A375</strong><br />

DHW P post-run 12041<br />

Circuit Setting range Factory setting<br />

2 0 ... 30 m 0 m<br />

Set the DHW pump (P3) post-run time (minutes). The DHW pump can<br />

continue to be switched ON after the DHW heating procedure in order to<br />

utilize the remaining heat in the heat exchanger / boiler.<br />

0 ... 30: Set the number of minutes for the post-run.<br />

Send desired T 12500<br />

Circuit Setting range Factory setting<br />

2 OFF / ON ON<br />

When the controller acts as a slave controller in a master / slave system,<br />

information about the desired flow temperature can be sent to the master<br />

controller via the <strong>ECL</strong> 485 bus.<br />

OFF: Information about the desired flow temperature is not<br />

sent to the master controller.<br />

ON: Information about the desired flow temperature is sent<br />

to the master controller.<br />

P exercise (pump exercise) 12022<br />

Circuit Setting range Factory setting<br />

2 OFF / ON ON<br />

Exercises the pump to avoid blocking in periods without heat demand.<br />

OFF: The pump exercise is not active.<br />

ON: The pump is switched ON for 1 minute every third day at<br />

noon (12:14 hours).<br />

M exercise (valve exercise) 12023<br />

Circuit Setting range Factory setting<br />

2 OFF / ON OFF<br />

Exercises the valve to avoid blocking in periods without heat demand.<br />

OFF: The valve exercise is not active.<br />

ON: The valve opens for 7 minutes and closes for 7 minutes<br />

every third day at noon (12:00 hours).<br />

In the master controller, 'Demand offset' must be set to a value in order<br />

to react on a desired flow temperature from a slave controller.<br />

140 DEN-SMT/DK VI.GU.L1.02 <strong>Danfoss</strong> District Energy

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!