Customer Name: Southern Light, LLC - AT&T Clec Online
Customer Name: Southern Light, LLC - AT&T Clec Online
Customer Name: Southern Light, LLC - AT&T Clec Online
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
UNBUNDLED NETWORK ELEMENTS - Kentucky Att: 2 Exh: A<br />
CATEGORY RATE ELEMENTS Interim Zone BCS USOC<br />
Rec<br />
Nonrecurring<br />
First Add'l<br />
Nonrecurring Disconnect<br />
First Add'l SOMEC SOMAN<br />
OSS Rates($)<br />
SOMAN SOMAN SOMAN SOMAN<br />
Maintenance of Service Charge, Premium, per half hour<br />
LOOP MODIFICATION<br />
UDC, UEA, UDL,<br />
UDN, USL, UAL,<br />
UHL, UCL, NTCVG,<br />
NTCUD, NTCD1,<br />
U1TD1, U1TD3,<br />
U1TDX, U1TS1,<br />
U1TVX, UDF,<br />
UDFCX, UDLSX,<br />
UE3, ULDD1,<br />
ULDD3, ULDDX,<br />
ULDS1, ULDVX,<br />
UNC1X, UNC3X,<br />
UNCDX, UNCSX,<br />
UNCVX, ULS<br />
UAL, UHL, UCL,<br />
UEQ, ULS, UEA,<br />
MVVPT 100.00 75.00<br />
Unbundled Loop Modification, Removal of Load Coils - 2 Wire pair<br />
UEANL, UEPSR,<br />
less than or equal to 18k ft, per Unbundled Loop<br />
Unbundled Loop Modification Removal of Load Coils - 4 Wire less<br />
UEPSB ULM2L 9.24 9.24<br />
than or equal to 18K ft, per Unbundled Loop UHL, UCL, UEA<br />
UAL, UHL, UCL,<br />
UEQ, ULS, UEA,<br />
ULM4L 9.24 9.24<br />
Unbundled Loop Modification Removal of Bridged Tap Removal,<br />
UEANL, UEPSR,<br />
per unbundled loop<br />
SUB-LOOPS<br />
Sub-Loop Distribution<br />
Sub-Loop - Per Cross Box Location - CLEC Feeder Facility Set-<br />
UEPSB ULMBT 10.47 10.47<br />
Up UEANL, UEF USBSA 207.91 207.91<br />
RATES($)<br />
Sub-Loop - Per Cross Box Location - Per 25 Pair Panel Set-Up UEANL, UEF USBSB 12.50 12.50<br />
Sub-Loop - Per Building Equipment Room - CLEC Feeder Facility<br />
Set-Up UEANL USBSC 80.87 80.87<br />
Sub-Loop - Per Building Equipment Room - Per 25 Pair Panel Set-<br />
Up UEANL USBSD 45.04 45.04<br />
Sub-Loop Distribution Per 2-Wire Analog Voice Grade Loop -<br />
Zone 1 1 UEANL USBN2 6.34 85.03 39.05 59.81 7.90<br />
Sub-Loop Distribution Per 2-Wire Analog Voice Grade Loop -<br />
Zone 2 2 UEANL USBN2 9.06 85.03 39.05 59.81 7.90<br />
Sub-Loop Distribution Per 2-Wire Analog Voice Grade Loop -<br />
Zone 3 3 UEANL USBN2 14.82 85.03 39.05 59.81 7.90<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 9.00 9.00<br />
Sub-Loop Distribution Per 4-Wire Analog Voice Grade Loop -<br />
Zone 1 1 UEANL USBN4 8.14 102.31 56.32 65.24 10.88<br />
Sub-Loop Distribution Per 4-Wire Analog Voice Grade Loop -<br />
Zone 2 2 UEANL USBN4 8.63 102.31 56.32 65.24 10.88<br />
Sub-Loop Distribution Per 4-Wire Analog Voice Grade Loop -<br />
Zone 3 3 UEANL USBN4 25.60 102.31 56.32 65.24 10.88<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 9.00 9.00<br />
Sub-Loop 2-Wire Intrabuilding Network Cable (INC) UEANL USBR2 2.57 68.35 22.36 59.81 7.90<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 9.00 9.00<br />
Sub-Loop 4-Wire Intrabuilding Network Cable (INC) UEANL USBR4 4.98 76.49 30.51 65.24 10.88<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 9.00 9.00<br />
Loop Testing - Basic 1st Half Hour UEANL URET1 46.88 0.00<br />
Loop Testing - Basic Additional Half Hour UEANL URETA 24.16 24.16<br />
2 Wire Copper Unbundled Sub-Loop Distribution - Zone 1 1 UEF UCS2X 5.45 85.03 39.05 59.81 7.90<br />
2 Wire Copper Unbundled Sub-Loop Distribution - Zone 2 2 UEF UCS2X 7.06 85.03 39.05 59.81 7.90<br />
2 Wire Copper Unbundled Sub-Loop Distribution - Zone 3 3 UEF UCS2X 9.67 85.03 39.05 59.81 7.90<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEF USBMC 9.00 9.00<br />
4 Wire Copper Unbundled Sub-Loop Distribution - Zone 1 1 UEF UCS4X 7.09 102.31 56.32 65.24 10.88<br />
4 Wire Copper Unbundled Sub-Loop Distribution - Zone 2 2 UEF UCS4X 8.66 102.31 56.32 65.24 10.88<br />
4 Wire Copper Unbundled Sub-Loop Distribution - Zone 3 3 UEF UCS4X 19.40 102.31 56.32 65.24 10.88<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEF USBMC 9.00 9.00<br />
Version: 1Q08 GENERIC INTERCONNECTION AGREEMENT 03/18/08 Page 37 of 96<br />
CCCS 130 of 370<br />
Page 130 of 374<br />
Svc Order<br />
Submitted<br />
Elec<br />
per LSR<br />
Svc Order<br />
Submitted<br />
Manually<br />
per LSR<br />
Incremental<br />
Charge -<br />
Manual Svc<br />
Order vs.<br />
Electronic-<br />
1st<br />
Incremental<br />
Charge -<br />
Manual Svc<br />
Order vs.<br />
Electronic-<br />
Add'l<br />
Incremental<br />
Charge -<br />
Manual Svc<br />
Order vs.<br />
Electronic-<br />
Disc 1st<br />
Incremental<br />
Charge -<br />
Manual Svc<br />
Order vs.<br />
Electronic-<br />
Disc Add'l