Customer Name: Southern Light, LLC - AT&T Clec Online
Customer Name: Southern Light, LLC - AT&T Clec Online
Customer Name: Southern Light, LLC - AT&T Clec Online
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Page 268 of 374<br />
ATT 4 – COLLOCATION/AT&T-9STATE<br />
PAGE 29 OF 44<br />
<strong>Southern</strong> <strong>Light</strong><br />
1Q08 GENERIC INTERCONNECTION AGREEMENT – 03/10/08<br />
8.9.3 AT&T will revise <strong>Southern</strong> <strong>Light</strong>’s Central Office recurring power charges, in accordance with<br />
Section 8.3 above, to reflect a power upgrade when <strong>Southern</strong> <strong>Light</strong> submits a Subsequent<br />
Application requesting an increase in the number of fused amps it is currently receiving from AT&T<br />
for its Collocation Space. If <strong>Southern</strong> <strong>Light</strong>’s existing fuses and power cables (for the A&B power<br />
feed) are not sufficient to support the additional number of fused amps requested, <strong>Southern</strong> <strong>Light</strong>’s<br />
AT&T Certified Supplier shall perform whatever activities are necessary, which may include the<br />
installation of new/additional fuses or power cables, to comply with the appropriate NEC, AT&T TR<br />
73503, Telcordia and ANSI Standards, as well as the requirements noted in Sections 8.9.1 and<br />
8.9.1.1 above. <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier shall provide notification to AT&T when<br />
these activities have been completed.<br />
8.9.4 AT&T will revise <strong>Southern</strong> <strong>Light</strong>’s Central Office recurring power charges, in accordance with<br />
Section 8.3 above, to reflect a power reduction upon AT&T’s receipt of the Power Reduction Form<br />
from <strong>Southern</strong> <strong>Light</strong>, certifying the completion of the power reduction work, including the removal of<br />
any associated power cabling by <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier. Notwithstanding the<br />
foregoing, if <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier has not removed or, at AT&T’s discretion, cut<br />
the power cabling within thirty (30) days, the power reduction will not become effective until the<br />
cabling is removed or, at AT&T’s discretion, cut by <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier and<br />
<strong>Southern</strong> <strong>Light</strong> shall pay for the amount of power that had been requested prior to the power<br />
reduction request for the period up to the date the power cabling is actually removed.<br />
8.9.5 If <strong>Southern</strong> <strong>Light</strong> requests an increase or a reduction in the amount of power that AT&T is currently<br />
providing in a Central Office, <strong>Southern</strong> <strong>Light</strong> must submit a Subsequent Application. In all states<br />
other than Florida and Tennessee if no modification to the Collocation Space is requested other<br />
than the increase or reduction in power, the Simple Augment fee will apply. In Florida and<br />
Tennessee the Power Reconfiguration Only Application Fee as set forth in Exhibit B will apply. If<br />
modifications are requested in addition to the increase or reduction of power, the Subsequent<br />
Application Fee will apply. AT&T will bill this nonrecurring fee on the date that AT&T provides an<br />
Application Response to <strong>Southern</strong> <strong>Light</strong>’s Subsequent Application.<br />
8.9.5.1 In Central Offices in Alabama and Louisiana, if <strong>Southern</strong> <strong>Light</strong> has existing power configurations<br />
currently served from the AT&T main power board and requests that its power be reconfigured to<br />
connect to an AT&T BDFB, in a specific AT&T Premises, <strong>Southern</strong> <strong>Light</strong> must submit a<br />
Subsequent Application to AT&T. AT&T will provide a response to such application within seven<br />
(7) days and no Simple Augment Application Fee will be assessed by AT&T for this one time only<br />
power reconfiguration to an AT&T BDFB. For any power reconfigurations thereafter, <strong>Southern</strong><br />
<strong>Light</strong> will submit a Subsequent Application and the appropriate Simple Augment Application Fee<br />
will apply.<br />
8.9.6 If <strong>Southern</strong> <strong>Light</strong> elects to install its own DC Power Plant, AT&T shall provide AC power to feed<br />
<strong>Southern</strong> <strong>Light</strong>’s DC Power Plant. Charges for AC power will be assessed on a per breaker<br />
ampere, per month basis, pursuant to the rates specified in Exhibit B. The AC power rates include<br />
recovery for the provision of commercial and standby AC power. When obtaining power from an<br />
AT&T service panel, protection devices and power cables must be engineered (sized) and installed<br />
by <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier, with the exception that AT&T shall engineer and<br />
install protection devices and power cables for Adjacent Collocation. <strong>Southern</strong> <strong>Light</strong>’s AT&T<br />
Certified Supplier must provide a copy of the engineering power specifications prior to the<br />
Commencement Date. AC power voltage and phase ratings shall be determined on a per location<br />
basis. At <strong>Southern</strong> <strong>Light</strong>’s option, <strong>Southern</strong> <strong>Light</strong> may arrange for AC power in an adjacent<br />
collocation arrangement from a retail provider of electrical power.<br />
8.9.7 <strong>Southern</strong> <strong>Light</strong> shall contract with an AT&T Certified Supplier to perform the installation and<br />
CCCS 268 of 370