ATT 4 – COLLOCATION/AT&T-9STATE<br />

PAGE 29 OF 44<br />

<strong>Southern</strong> <strong>Light</strong><br />

1Q08 GENERIC INTERCONNECTION AGREEMENT – 03/10/08<br />

8.9.3 AT&T will revise <strong>Southern</strong> <strong>Light</strong>’s Central Office recurring power charges, in accordance with<br />

Section 8.3 above, to reflect a power upgrade when <strong>Southern</strong> <strong>Light</strong> submits a Subsequent<br />

Application requesting an increase in the number of fused amps it is currently receiving from AT&T<br />

for its Collocation Space. If <strong>Southern</strong> <strong>Light</strong>’s existing fuses and power cables (for the A&B power<br />

feed) are not sufficient to support the additional number of fused amps requested, <strong>Southern</strong> <strong>Light</strong>’s<br />

AT&T Certified Supplier shall perform whatever activities are necessary, which may include the<br />

installation of new/additional fuses or power cables, to comply with the appropriate NEC, AT&T TR<br />

73503, Telcordia and ANSI Standards, as well as the requirements noted in Sections 8.9.1 and<br />

8.9.1.1 above. <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier shall provide notification to AT&T when<br />

these activities have been completed.<br />

8.9.4 AT&T will revise <strong>Southern</strong> <strong>Light</strong>’s Central Office recurring power charges, in accordance with<br />

Section 8.3 above, to reflect a power reduction upon AT&T’s receipt of the Power Reduction Form<br />

from <strong>Southern</strong> <strong>Light</strong>, certifying the completion of the power reduction work, including the removal of<br />

any associated power cabling by <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier. Notwithstanding the<br />

foregoing, if <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier has not removed or, at AT&T’s discretion, cut<br />

the power cabling within thirty (30) days, the power reduction will not become effective until the<br />

cabling is removed or, at AT&T’s discretion, cut by <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier and<br />

<strong>Southern</strong> <strong>Light</strong> shall pay for the amount of power that had been requested prior to the power<br />

reduction request for the period up to the date the power cabling is actually removed.<br />

8.9.5 If <strong>Southern</strong> <strong>Light</strong> requests an increase or a reduction in the amount of power that AT&T is currently<br />

providing in a Central Office, <strong>Southern</strong> <strong>Light</strong> must submit a Subsequent Application. In all states<br />

other than Florida and Tennessee if no modification to the Collocation Space is requested other<br />

than the increase or reduction in power, the Simple Augment fee will apply. In Florida and<br />

Tennessee the Power Reconfiguration Only Application Fee as set forth in Exhibit B will apply. If<br />

modifications are requested in addition to the increase or reduction of power, the Subsequent<br />

Application Fee will apply. AT&T will bill this nonrecurring fee on the date that AT&T provides an<br />

Application Response to <strong>Southern</strong> <strong>Light</strong>’s Subsequent Application.<br />

8.9.5.1 In Central Offices in Alabama and Louisiana, if <strong>Southern</strong> <strong>Light</strong> has existing power configurations<br />

currently served from the AT&T main power board and requests that its power be reconfigured to<br />

connect to an AT&T BDFB, in a specific AT&T Premises, <strong>Southern</strong> <strong>Light</strong> must submit a<br />

Subsequent Application to AT&T. AT&T will provide a response to such application within seven<br />

(7) days and no Simple Augment Application Fee will be assessed by AT&T for this one time only<br />

power reconfiguration to an AT&T BDFB. For any power reconfigurations thereafter, <strong>Southern</strong><br />

<strong>Light</strong> will submit a Subsequent Application and the appropriate Simple Augment Application Fee<br />

will apply.<br />

8.9.6 If <strong>Southern</strong> <strong>Light</strong> elects to install its own DC Power Plant, AT&T shall provide AC power to feed<br />

<strong>Southern</strong> <strong>Light</strong>’s DC Power Plant. Charges for AC power will be assessed on a per breaker<br />

ampere, per month basis, pursuant to the rates specified in Exhibit B. The AC power rates include<br />

recovery for the provision of commercial and standby AC power. When obtaining power from an<br />

AT&T service panel, protection devices and power cables must be engineered (sized) and installed<br />

by <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier, with the exception that AT&T shall engineer and<br />

install protection devices and power cables for Adjacent Collocation. <strong>Southern</strong> <strong>Light</strong>’s AT&T<br />

Certified Supplier must provide a copy of the engineering power specifications prior to the<br />

Commencement Date. AC power voltage and phase ratings shall be determined on a per location<br />

basis. At <strong>Southern</strong> <strong>Light</strong>’s option, <strong>Southern</strong> <strong>Light</strong> may arrange for AC power in an adjacent<br />

collocation arrangement from a retail provider of electrical power.<br />

8.9.7 <strong>Southern</strong> <strong>Light</strong> shall contract with an AT&T Certified Supplier to perform the installation and<br />

CCCS 268 of 370

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!