ATT 4 – COLLOCATION/AT&T-9STATE<br />
PAGE 18 OF 44<br />
<strong>Southern</strong> <strong>Light</strong><br />
1Q08 GENERIC INTERCONNECTION AGREEMENT – 03/10/08<br />
and cleaning of the Remote Collocation Space. <strong>Southern</strong> <strong>Light</strong> shall be responsible for removing<br />
any of <strong>Southern</strong> <strong>Light</strong>’s debris from the Remote Collocation Space and from in and around the<br />
Remote Site Location on each visit.<br />
6 Ordering and Preparation of Collocation Space<br />
6.1 Initial Application. For <strong>Southern</strong> <strong>Light</strong>’s or <strong>Southern</strong> <strong>Light</strong>’s Guest’s(s’) initial equipment placement,<br />
<strong>Southern</strong> <strong>Light</strong> shall input a physical Expanded Interconnection Application Document (Initial<br />
Application) for physical Collocation Space directly into AT&T’s electronic application (e.App)<br />
system for processing. The Initial Application is considered Bona Fide when it is complete and<br />
accurate, meaning that all of the required fields on the Initial Application are completed with the<br />
appropriate type of information. An Initial Application Fee, as set forth in Exhibit B, will apply to<br />
each Initial Application submitted by <strong>Southern</strong> <strong>Light</strong> for Central Office or Remote Site Collocation,<br />
as applicable, and will be billed by AT&T on the date AT&T provides <strong>Southern</strong> <strong>Light</strong> with an<br />
Application Response.<br />
6.1.1 For Remote Site Collocation, a request for additional space at a later date will require the<br />
submission of an Initial Application. The installation of additional shelves/equipment within an<br />
existing bay does not require an Initial Application.<br />
6.2 Subsequent Application. In the event <strong>Southern</strong> <strong>Light</strong> or <strong>Southern</strong> <strong>Light</strong>’s Guest(s) desires to<br />
modify its use of the Collocation Space in a Central Office after a BFFO, <strong>Southern</strong> <strong>Light</strong> shall<br />
complete an application that contains all of the detailed information associated with a requested<br />
Alteration of the Collocation Space, as defined in Section 5.15 above (Subsequent Application).<br />
The Subsequent Application will be considered Bona Fide when it is complete and accurate,<br />
meaning that all of the required fields on the Subsequent Application have been completed with the<br />
appropriate type of information associated with the requested Alteration. AT&T shall determine<br />
what modifications, if any, to the AT&T Premises are required to accommodate the change(s)<br />
requested by <strong>Southern</strong> <strong>Light</strong> in the Subsequent Application. Such modifications to the AT&T<br />
Premises may include, but are not limited to, floor loading changes, changes necessary to meet<br />
HVAC requirements, changes to power plant requirements, equipment additions, etc.<br />
6.2.1 Subsequent Application Fees. The application fee paid by <strong>Southern</strong> <strong>Light</strong> for an Alteration in a<br />
Central Office shall be dependent upon the level of assessment needed to provide a complete<br />
Application Response for the Alteration requested. Where the Subsequent Application does not<br />
require provisioning or construction work, but requires AT&T to perform an administrative activity,<br />
an Administrative Only Application Fee shall apply as set forth in Exhibit B. The Administrative<br />
Only Application Fee will apply to Subsequent Applications associated with a transfer of ownership<br />
of the Collocation Space, the addition, exchange or removal of equipment from the Collocation<br />
Space (where the removal requires no physical work to be performed by AT&T which require no<br />
additional space, power or terminations to be provided to <strong>Southern</strong> <strong>Light</strong>’s collocation<br />
arrangement), and a virtual-to-physical conversion (in place). The Co-Carrier Cross<br />
Connect/Direct Connect Application Fee will apply when <strong>Southern</strong> <strong>Light</strong> submits a Subsequent<br />
Application for a direct connection between its own physical and virtual Collocation Space(s) in the<br />
same AT&T Central Office or between its physical or virtual Collocation Space and that of another<br />
collocated telecommunications carrier within the same AT&T Central Office. In Florida and<br />
Tennessee, the Power Reconfiguration Only Application Fee will apply when <strong>Southern</strong> <strong>Light</strong><br />
submits a Subsequent Application that reflects only an upgrade or reduction in the amount of<br />
power that AT&T is currently providing to <strong>Southern</strong> <strong>Light</strong>’s physical Collocation Space in a Central<br />
Office. The fee for a Subsequent Application, for which the Alteration requested has limited effect<br />
(e.g., requires limited assessment and sufficient cable support structure, HVAC, power and<br />
CCCS 257 of 370