Page 260 of 374<br />

ATT 4 – COLLOCATION/AT&T-9STATE<br />

PAGE 21 OF 44<br />

<strong>Southern</strong> <strong>Light</strong><br />

1Q08 GENERIC INTERCONNECTION AGREEMENT – 03/10/08<br />

including sufficient information to enable <strong>Southern</strong> <strong>Light</strong> to place a Firm Order. The Application<br />

Response will include, at a minimum, the configuration of the space, the Cable Installation Fee, the<br />

Cable Records Fee and any other applicable space preparation fees, as described in Section 8<br />

below. When <strong>Southern</strong> <strong>Light</strong> submits ten (10) or more applications within ten (10) days, the initial<br />

fifteen (15) day response interval will increase by ten (10) days for every additional ten (10)<br />

applications or fraction thereof.<br />

6.10 Application Modifications. If a modification or revision is made to any information in the Bona Fide<br />

application after AT&T has provided the Application Response and prior to a BFFO, with the<br />

exception of modifications to (1) <strong>Customer</strong> Information, (2) Contact Information or (3) Billing<br />

Contact Information, whether at the request of <strong>Southern</strong> <strong>Light</strong> or as necessitated by technical<br />

considerations, the application shall be considered a new application and handled as a new<br />

application with respect to the response and provisioning intervals. AT&T will charge <strong>Southern</strong><br />

<strong>Light</strong> the appropriate application fee associated with the level of assessment performed by AT&T,<br />

pursuant to Sections 6.1 and 6.2 above.<br />

6.11 Bona Fide Firm Order<br />

6.11.1 <strong>Southern</strong> <strong>Light</strong> shall indicate its intent to proceed with a Collocation Space request in an AT&T<br />

Premises by submitting a BFFO to AT&T. The BFFO must be received by AT&T no later than<br />

thirty (30) days after AT&T’s Application Response to <strong>Southern</strong> <strong>Light</strong>’s Bona Fide application or<br />

<strong>Southern</strong> <strong>Light</strong>’s application will expire.<br />

6.11.2 AT&T will establish a Firm Order date based upon the date AT&T is in receipt of <strong>Southern</strong> <strong>Light</strong>’s<br />

BFFO. AT&T will acknowledge the receipt of <strong>Southern</strong> <strong>Light</strong>’s BFFO within seven (7) days of<br />

receipt, so that <strong>Southern</strong> <strong>Light</strong> will have positive confirmation that its BFFO has been received.<br />

AT&T’s response to a BFFO will include a Firm Order Confirmation, which contains the firm order<br />

date. No revisions may be made to a BFFO.<br />

7 Construction and Provisioning<br />

7.1 Construction and Provisioning Intervals<br />

7.1.1 In Florida and Tennessee, AT&T will complete construction of physical Collocation Space as soon<br />

as possible within a maximum of ninety (90) days from receipt of a BFFO or as agreed to by the<br />

Parties. For virtual Collocation Space, AT&T will complete construction as soon as possible within<br />

a maximum of sixty (60) days from receipt of a BFFO or as agreed to by the Parties. For<br />

Alterations requested to Collocation Space after the initial space has been completed, AT&T will<br />

complete construction for Collocation Space as soon as possible within a maximum of forty-five<br />

(45) days from receipt of a BFFO or as agreed to by the Parties, as long as no additional space<br />

has been requested by <strong>Southern</strong> <strong>Light</strong>. If additional space has been requested by <strong>Southern</strong> <strong>Light</strong>,<br />

AT&T will complete construction for the requested Collocation Space as soon as possible within a<br />

maximum of ninety (90) days from receipt of a BFFO for physical Collocation Space and forty five<br />

(45) days from receipt of a BFFO for virtual Collocation Space. If AT&T does not believe that<br />

construction will be completed within the relevant provisioning interval and AT&T and <strong>Southern</strong><br />

<strong>Light</strong> cannot agree upon a completion date, within forty-five (45) days of receipt of the BFFO for an<br />

initial request, or within thirty (30) days of receipt of the BFFO for an Alteration, AT&T may seek an<br />

extension from the Commission.<br />

7.1.2 In Alabama, Georgia, Kentucky, Louisiana, Mississippi, North Carolina and South Carolina, AT&T<br />

will complete construction for caged physical Collocation Space under ordinary conditions as soon<br />

as possible within a maximum of ninety (90) days from receipt of a BFFO or as agreed to by the<br />

Parties. AT&T will complete construction for cageless physical Collocation Space under ordinary<br />

CCCS 260 of 370