ATT 4 – COLLOCATION/AT&T-9STATE<br />
PAGE 6 OF 44<br />
<strong>Southern</strong> <strong>Light</strong><br />
1Q08 GENERIC INTERCONNECTION AGREEMENT – 03/10/08<br />
2.2.1 AT&T will provide this information within thirty (30) days of a <strong>Southern</strong> <strong>Light</strong> request subject to the<br />
following conditions: (i) the information will only be provided on a CD in the same format in which it<br />
appears in AT&T’s systems; and (ii) the information will only be provided for each serving wire<br />
center designated by <strong>Southern</strong> <strong>Light</strong>, up to a maximum of thirty (30) wire centers per <strong>Southern</strong><br />
<strong>Light</strong> request per month per state. AT&T will bill the nonrecurring charge pursuant to the rates in<br />
Exhibit B at the time AT&T sends the CD.<br />
3 Collocation Options<br />
3.1 Cageless Collocation. AT&T shall allow <strong>Southern</strong> <strong>Light</strong> to collocate <strong>Southern</strong> <strong>Light</strong>’s equipment<br />
and facilities without requiring the construction of a cage or similar structure. AT&T shall allow<br />
<strong>Southern</strong> <strong>Light</strong> to have direct access to <strong>Southern</strong> <strong>Light</strong>’s equipment and facilities in accordance<br />
with Section 5.1.2 below. AT&T shall make cageless collocation available in single bay<br />
increments. Except where <strong>Southern</strong> <strong>Light</strong>’s equipment requires special technical considerations<br />
(e.g., special cable racking or isolated ground plane), AT&T shall assign cageless Collocation<br />
Space in conventional equipment rack lineups where feasible. For equipment requiring special<br />
technical considerations, <strong>Southern</strong> <strong>Light</strong> must provide the equipment layout, including spatial<br />
dimensions for such equipment pursuant to generic requirements contained in Telcordia GR-63-<br />
Core, and shall be responsible for compliance with all special technical requirements associated<br />
with such equipment.<br />
3.2 Caged Collocation<br />
3.2.1 AT&T will make caged Collocation Space in Central Offices available in fifty (50) square foot<br />
increments. At <strong>Southern</strong> <strong>Light</strong>’s option and expense, <strong>Southern</strong> <strong>Light</strong> will arrange with a Supplier<br />
certified by AT&T (AT&T Certified Supplier) to construct a collocation arrangement enclosure in<br />
accordance with AT&T’s specifications for a wire mesh enclosure prior to starting equipment<br />
installation. Where local building codes require enclosure specifications more stringent than<br />
AT&T’s wire mesh enclosure specifications, <strong>Southern</strong> <strong>Light</strong> and <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified<br />
Supplier must comply with the more stringent local building code requirements. <strong>Southern</strong> <strong>Light</strong>’s<br />
AT&T Certified Supplier shall be responsible for filing and obtaining any and all necessary permits<br />
and/or licenses for such construction. AT&T or AT&T’s designated agent or contractor shall<br />
provide, at <strong>Southern</strong> <strong>Light</strong>’s expense, documentation, which may include existing building<br />
architectural drawings, enclosure drawings, specifications, etc., necessary for <strong>Southern</strong> <strong>Light</strong>’s<br />
AT&T Certified Supplier to obtain all necessary permits and/or other licenses. <strong>Southern</strong> <strong>Light</strong>’s<br />
AT&T Certified Supplier shall bill <strong>Southern</strong> <strong>Light</strong> directly for all work performed for <strong>Southern</strong> <strong>Light</strong>.<br />
AT&T shall have no liability for, nor responsibility to pay, such charges imposed by <strong>Southern</strong><br />
<strong>Light</strong>’s AT&T Certified Supplier. <strong>Southern</strong> <strong>Light</strong> must provide the local AT&T Central Office<br />
Building Contact with two (2) Access Keys that will allow entry into the locked enclosure. Except in<br />
the case of an emergency, AT&T will not access <strong>Southern</strong> <strong>Light</strong>’s locked enclosure prior to<br />
notifying <strong>Southern</strong> <strong>Light</strong> at least forty-eight (48) hours or two (2) business days, whichever is<br />
greater, before access to <strong>Southern</strong> <strong>Light</strong>’s Collocation Space is required. Upon request, AT&T<br />
shall construct the enclosure for <strong>Southern</strong> <strong>Light</strong>.<br />
3.2.2 In the event <strong>Southern</strong> <strong>Light</strong>’s AT&T Certified Supplier will construct the collocation arrangement<br />
enclosure, AT&T may elect to review <strong>Southern</strong> <strong>Light</strong>’s plans and specifications, prior to allowing<br />
the construction to start, to ensure compliance with AT&T’s wire mesh enclosure specifications.<br />
AT&T will notify <strong>Southern</strong> <strong>Light</strong> of its desire to conduct this review in AT&T’s Application Response,<br />
as defined herein, to <strong>Southern</strong> <strong>Light</strong>’s Initial Application. If <strong>Southern</strong> <strong>Light</strong>’s Initial Application does<br />
not indicate its desire to construct its own enclosure and <strong>Southern</strong> <strong>Light</strong> subsequently decides to<br />
construct its own enclosure prior to AT&T’s Application Response, then <strong>Southern</strong> <strong>Light</strong> will<br />
resubmit its Initial Application, indicating its desire to construct its own enclosure. If <strong>Southern</strong> <strong>Light</strong><br />
CCCS 245 of 370