Customer Name: Southern Light, LLC - AT&T Clec Online
Customer Name: Southern Light, LLC - AT&T Clec Online
Customer Name: Southern Light, LLC - AT&T Clec Online
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
UNBUNDLED NETWORK ELEMENTS - North Carolina Att: 2 Exh: A<br />
CATEGORY RATE ELEMENTS Interim Zone BCS USOC<br />
Rec<br />
Nonrecurring<br />
First Add'l<br />
Nonrecurring Disconnect<br />
First Add'l SOMEC SOMAN<br />
OSS Rates($)<br />
SOMAN SOMAN SOMAN SOMAN<br />
Maintenance of Service Charge, Premium, per half hour<br />
LOOP MODIFICATION<br />
UDC, UEA, UDL,<br />
UDN, USL, UAL,<br />
UHL, UCL, NTCVG,<br />
NTCUD, NTCD1,<br />
U1TD1, U1TD3,<br />
U1TDX, U1TS1,<br />
U1TVX, UDF,<br />
UDFCX, UDLSX,<br />
UE3, ULDD1,<br />
ULDD3, ULDDX,<br />
ULDS1, ULDVX,<br />
UNC1X, UNC3X,<br />
UNCDX, UNCSX,<br />
UNCVX, ULS<br />
UAL, UHL, UCL,<br />
UEQ, ULS, UEA,<br />
MVVPT 100.00 75.00<br />
Unbundled Loop Modification, Removal of Load Coils - 2 Wire pair<br />
UEANL, UEPSR,<br />
less than or equal to 18k ft, per Unbundled Loop<br />
Unbundled Loop Modification, Removal of Load Coils - 2 wire<br />
UEPSB ULM2L 0.00 0.00<br />
greater than 18k ft<br />
Unbundled Loop Modification Removal of Load Coils - 4 Wire less<br />
UCL, ULS, UEQ ULM2G 0.00 0.00<br />
than or equal to 18K ft, per Unbundled Loop<br />
Unbundled Loop Modification Removal of Load Coils - 4 Wire pair<br />
UHL, UCL, UEA ULM4L 0.00 0.00<br />
greater than 18k ft UCL<br />
UAL, UHL, UCL,<br />
UEQ, ULS, UEA,<br />
ULM4G 0.00 0.00<br />
Unbundled Loop Modification Removal of Bridged Tap Removal,<br />
UEANL, UEPSR,<br />
per unbundled loop<br />
SUB-LOOPS<br />
Sub-Loop Distribution<br />
Sub-Loop - Per Cross Box Location - CLEC Feeder Facility Set-<br />
UEPSB ULMBT 12.15 12.15<br />
Up UEANL, UEF USBSA 144.09<br />
RATES($)<br />
Sub-Loop - Per Cross Box Location - Per 25 Pair Panel Set-Up UEANL, UEF USBSB 10.99 10.99<br />
Sub-Loop - Per Building Equipment Room - CLEC Feeder Facility<br />
Set-Up UEANL USBSC 86.16<br />
Sub-Loop - Per Building Equipment Room - Per 25 Pair Panel Set-<br />
Up UEANL USBSD 27.13 27.13<br />
Sub-Loop Distribution Per 2-Wire Analog Voice Grade Loop -<br />
Zone 1 1 UEANL USBN2 6.70 63.89 30.06<br />
Sub-Loop Distribution Per 2-Wire Analog Voice Grade Loop -<br />
Zone 2 2 UEANL USBN2 9.93 63.89 30.06<br />
Sub-Loop Distribution Per 2-Wire Analog Voice Grade Loop -<br />
Zone 3 3 UEANL USBN2 12.79 63.89 30.06<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 7.92 7.92<br />
Sub-Loop Distribution Per 4-Wire Analog Voice Grade Loop -<br />
Zone 1 1 UEANL USBN4 10.81 76.75 42.92<br />
Sub-Loop Distribution Per 4-Wire Analog Voice Grade Loop -<br />
Zone 2 2 UEANL USBN4 14.16 76.75 42.92<br />
Sub-Loop Distribution Per 4-Wire Analog Voice Grade Loop -<br />
Zone 3 3 UEANL USBN4 24.67 76.75 42.92<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 7.92 7.92<br />
Sub-Loop 2-Wire Intrabuilding Network Cable (INC) UEANL USBR2 2.34 51.48 17.65<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 7.92 7.92<br />
Sub-Loop 4-Wire Intrabuilding Network Cable (INC) UEANL USBR4 4.18 57.54 23.71<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair<br />
Service Order charges will apply only once per sub-loop<br />
UEANL USBMC 7.92 7.92<br />
Loop Testing - Basic 1st Half Hour UEANL URET1 33.17 0.00<br />
Loop Testing - Basic Additional Half Hour UEANL URETA 19.28 19.28<br />
2 Wire Copper Unbundled Sub-Loop Distribution - Zone 1 1 UEF UCS2X 5.43 63.89 30.06<br />
2 Wire Copper Unbundled Sub-Loop Distribution - Zone 2 2 UEF UCS2X 8.04 63.89 30.06<br />
2 Wire Copper Unbundled Sub-Loop Distribution - Zone 3 3 UEF UCS2X 9.79 63.89 30.06<br />
Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEF USBMC 7.92 7.92<br />
4 Wire Copper Unbundled Sub-Loop Distribution - Zone 1 1 UEF UCS4X 6.34 76.75 42.92<br />
Version: 1Q08 GENERIC INTERCONNECTION AGREEMENT 03/18/08 Page 71 of 96<br />
CCCS 164 of 370<br />
Page 164 of 374<br />
Svc Order<br />
Submitted<br />
Elec<br />
per LSR<br />
Svc Order<br />
Submitted<br />
Manually<br />
per LSR<br />
Incremental<br />
Charge -<br />
Manual Svc<br />
Order vs.<br />
Electronic-<br />
1st<br />
Incremental<br />
Charge -<br />
Manual Svc<br />
Order vs.<br />
Electronic-<br />
Add'l<br />
Incremental<br />
Charge -<br />
Manual Svc<br />
Order vs.<br />
Electronic-<br />
Disc 1st<br />
Incremental<br />
Charge -<br />
Manual Svc<br />
Order vs.<br />
Electronic-<br />
Disc Add'l