Page 61 of 374<br />

ATT 2 – NETWORK ELEMENTS AND OTHER SERVICES/AT&T-9STATE<br />

PAGE 12 OF 44<br />

<strong>Southern</strong> <strong>Light</strong><br />

1Q08 GENERIC INTERCONNECTION AGREEMENT – 03/10/08<br />

2.1.4.7.2.3.2 If <strong>Southern</strong> <strong>Light</strong> fails to submit the LSR(s) or spreadsheet(s) for all of its Subsequent Embedded<br />

Base by one hundred eighty (180) days after the date of AT&T’s Accessible Letter identifying the<br />

Subsequent Wire Center List, AT&T will identify <strong>Southern</strong> <strong>Light</strong>’s remaining Subsequent Embedded<br />

Base, if any, and will transition such circuits to the equivalent tariffed AT&T service(s). In the states<br />

of Florida, Mississippi and South Carolina, those circuits identified and transitioned by AT&T shall<br />

be subject to the applicable disconnect charges as set forth in this Agreement and the full<br />

nonrecurring charges for installation of the equivalent tariffed AT&T service as set forth in AT&T’s<br />

tariffs. In the states of Alabama, Georgia, and North Carolina, those circuits identified and<br />

transitioned by AT&T shall be subject to the applicable switch-as-is rates set forth in Exhibit A of<br />

Attachment 2. In the state of Louisiana, those circuits identified and transitioned by AT&T shall be<br />

subject to the full nonrecurring charges for installation of the equivalent tariffed AT&T service as set<br />

forth in AT&T’s tariffs.<br />

2.1.4.7.2.3.3 For Subsequent Embedded Base circuits converted pursuant to Section 2.1.4.7.2.3 above or<br />

transitioned pursuant to Section 2.1.4.7.2.3.2 above, the applicable recurring tariff charges shall<br />

apply as of the earlier of the date each circuit is converted or transitioned, as applicable, or the first<br />

day after the end of the Subsequent Transition Period.<br />

2.1.5 Where facilities are available, AT&T will install Loops in compliance with AT&T’s Products and<br />

Services Interval Guide available at AT&T’s Wholesale – Southeast Region Web site. For orders of<br />

fifteen (15) or more Loops, the installation and any applicable Order Coordination (OC) as<br />

described below will be handled on a project basis, and the intervals will be set by the AT&T project<br />

manager for that order. When Loops require a Service Inquiry (SI) prior to issuing the order to<br />

determine if facilities are available, the interval for the SI process is separate from the installation<br />

interval.<br />

2.1.6 The Loop shall be provided to <strong>Southern</strong> <strong>Light</strong> in accordance with AT&T’s TR73600 Unbundled<br />

Local Loop Technical Specification and applicable industry standard technical references.<br />

2.1.7 AT&T will only provision, maintain and repair the Loops to the standards that are consistent with the<br />

type of Loop ordered.<br />

2.1.7.1 When an AT&T technician is required to be dispatched to provision the Loop, AT&T will tag the<br />

Loop with the Circuit ID number and the name of the ordering CLEC. When a dispatch is not<br />

required to provision the Loop, AT&T will tag the Loop on the next required visit to the customer’s<br />

location. If <strong>Southern</strong> <strong>Light</strong> wants to ensure the Loop is tagged during the provisioning process for<br />

Loops that may not require a dispatch (e.g., UVL-SL1, UVL-SL2, and UCL-ND), <strong>Southern</strong> <strong>Light</strong><br />

may order Loop Tagging. Rates for Loop Tagging are as set forth in Exhibit A.<br />

2.1.7.2 For voice grade Loop orders (or orders for Loops intended to provide voice grade services),<br />

<strong>Southern</strong> <strong>Light</strong> shall have dial-tone available for that Loop forty-eight (48) hours prior to the Loop<br />

order completion due date. This applies to all conversions from one provider to another provider as<br />

well as Service Rearrangements as set forth in Section 2.1.12. Where <strong>Southern</strong> <strong>Light</strong> dial-tone is<br />

not available on the conversion date the Loop will not be cut over and the Loop order will be<br />

returned to <strong>Southern</strong> <strong>Light</strong> for rescheduling.<br />

CCCS 61 of 370