09.08.2013 Views

Customer Name: Southern Light, LLC - AT&T Clec Online

Customer Name: Southern Light, LLC - AT&T Clec Online

Customer Name: Southern Light, LLC - AT&T Clec Online

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 261 of 374<br />

ATT 4 – COLLOCATION/AT&T-9STATE<br />

PAGE 22 OF 44<br />

<strong>Southern</strong> <strong>Light</strong><br />

1Q08 GENERIC INTERCONNECTION AGREEMENT – 03/10/08<br />

conditions as soon as possible within a maximum of sixty (60) days from receipt of a BFFO and<br />

ninety (90) days from receipt of a BFFO for extraordinary conditions, or as agreed to by the Parties.<br />

Ordinary conditions are defined as space available with only minor changes required to AT&T’s<br />

support systems. (Examples include, but are not limited to: minor modifications to HVAC, cabling<br />

and AT&T’s power plant.) Extraordinary conditions include, but may not be limited to: major AT&T<br />

equipment rearrangements or additions; power plant additions or upgrades; major mechanical<br />

additions or upgrades; major upgrades for ADA compliance; environmental hazards or hazardous<br />

materials abatement; and arrangements for which equipment shipping intervals are extraordinary in<br />

length. The Parties may mutually agree to renegotiate an alternative provisioning interval for the<br />

Collocation Space requested or AT&T may seek a waiver from the ordered interval, as set forth<br />

above, from the appropriate Commission, if AT&T does not believe that construction will be<br />

completed within the relevant provisioning interval.<br />

7.1.3 Records Only Change. When <strong>Southern</strong> <strong>Light</strong> adds equipment, that was originally included on<br />

<strong>Southern</strong> <strong>Light</strong>’s Initial Application or a Subsequent Application, and the installation of this<br />

equipment requires no additional space preparation work or cable terminations on the part of<br />

AT&T, then AT&T will impose no additional charges or intervals.<br />

7.1.4 For Central Offices in the states of Alabama, Georgia, Kentucky, Louisiana, Mississippi, North<br />

Carolina, and South Carolina, AT&T will provide the reduced intervals outlined below to <strong>Southern</strong><br />

<strong>Light</strong>, when <strong>Southern</strong> <strong>Light</strong> requests an Alteration specifically identified in Sections 7.1.4.1 through<br />

7.1.4.9 below as an “Augment”. Except as otherwise set forth in Section 7.1.4.10 below, such<br />

Augment will require a Subsequent Application and will result in the assessment of the appropriate<br />

application fee associated with the type of Augment requested by <strong>Southern</strong> <strong>Light</strong>. AT&T will<br />

assess the appropriate nonrecurring application fee set forth in Exhibit B on the date that it<br />

provides an Application Response to <strong>Southern</strong> <strong>Light</strong>.<br />

7.1.4.1 Simple Augments will be completed within twenty (20) days after receipt of the BFFO for an:<br />

− Extension of Existing AC Circuit Capacity within Arrangement where Sufficient Circuit<br />

Capacity is Available<br />

− Fuse Change and/or Increase or Decrease -48 Volt (-48V) DC Power<br />

7.1.4.2 Minor Augments will be completed within forty-five (45) days after receipt of the BFFO for:<br />

− 168 DS1 Terminations at the AT&T Demarcation Frame (Databasing Only; Panels, Relay<br />

Racks and Overhead Racking Exist)<br />

− 96 DS3 Terminations at the AT&T Demarcation Frame (Databasing Only; Panels, Relay<br />

Racks and Overhead Racking Exist)<br />

− 99 Fiber terminations at the AT&T Demarcation Frame (Databasing Only; Panels, Relay<br />

Racks and Overhead Racking Exist)<br />

− Maximum of 2000 Service Ready DS0 Terminations at the AT&T Demarcation Frame<br />

(Databasing Only; Panels, Relay Racks and Overhead Racking Exist)<br />

7.1.4.3 Intermediate Augments will be completed within sixty (60) days after receipt of the BFFO for:<br />

− 168 DS1s (Databasing and Installation of Termination Panels, Relay Racks or Additional<br />

Structure, as Required)<br />

− 96 DS3s (Databasing and Installation of Termination Panels, Relay Racks or Additional<br />

Structure, as Required)<br />

− 99 Fiber Terminations (Databasing and Installation of Termination Panels, Relay Racks or<br />

CCCS 261 of 370

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!