Manual tehnic automate cafea Saeco Group 500
Manual tehnic automate cafea Saeco Group 500
Manual tehnic automate cafea Saeco Group 500
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
- Position the vending machine, checking the<br />
levelling by means of the adjustable feet<br />
already assembled on the machine (fig.11).<br />
Make sure that the vending machine does not<br />
have an inclination exceeding 2 degrees.<br />
fig.11<br />
The SAECO International <strong>Group</strong> declines all<br />
responsibility for inconveniences due to the<br />
failure in observing the above mentioned<br />
installation rules.<br />
If installation takes place in safety evacuation<br />
corridors, make sure that the machine with the<br />
door open assure sufficient space for people to<br />
pass by (fig. 10).<br />
In order to avoid the floor to get dirty as a result<br />
of accidental spillage of products, use, if<br />
necessary, a sufficiently wide protecting device<br />
to cover the operating area under the vending<br />
machine.<br />
6.2 Receipt<br />
Upon receipt of the automatic vending machine,<br />
it is necessary to check it has not suffered<br />
damage during transport. If damage of any kind<br />
is noticed, immediately place a claim with the<br />
forwarder.<br />
An envelope is supplied with the vending<br />
machine, called 'CUSTOMER KIT', containing<br />
the objects shown in Fig. 12.<br />
fig.12<br />
fig.13<br />
- Instruction booklet.<br />
- Powder tank plates and prices in<br />
euro.<br />
- Pushbutton panel selection<br />
labels.<br />
- Instruction labels.<br />
- Wiring and hydraulic diagram.<br />
- Power cord.<br />
- Safety micro key<br />
(Maintenance technician).<br />
- Declaration of conformity.<br />
6.3 Unpacking<br />
English<br />
- Free the vending machine from the packaging,<br />
cutting the protective film in which it is wrapped,<br />
along one of the protection angles (fig.13).<br />
15