24.08.2013 Views

Manual tehnic automate cafea Saeco Group 500

Manual tehnic automate cafea Saeco Group 500

Manual tehnic automate cafea Saeco Group 500

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

English<br />

6.8.6 Payment system installation<br />

The machine does not have a payment system.<br />

Any possible damage to the vending machine<br />

itself and injury to people resulting from its<br />

incorrect installation are the responsibility of the<br />

installer of the payment system.<br />

- remove the support bracket from the machine<br />

(fig. 39)<br />

26<br />

fig.39<br />

A B<br />

fig.40<br />

- hook the coiner unit to the support bracket<br />

(fig.40A)<br />

- fix the support bracket by means of the two<br />

knobs (fig. 40B)<br />

- connect the coiner unit to the CPU board.<br />

N.B.: The 24Vdc coin validator and the MDB<br />

systems have to be directly connected to the<br />

CPU board while the executive serial systems<br />

have to be connected to the CPU board through<br />

the supplied interface cable.<br />

The 12Vdc coin validators require a special<br />

interface board in order to be connected to the<br />

CPU board.<br />

- Then, access the programming for the<br />

correct settings.<br />

Refer to section '7 PROGRAMMING' to verify if<br />

the parameter setting is consistent with the<br />

system used.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!