1969 Cadillac - GM Heritage Center
1969 Cadillac - GM Heritage Center
1969 Cadillac - GM Heritage Center
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PREFERENCE LIST<br />
!<br />
iiilH<br />
(<br />
that is to<br />
'ted in the<br />
it is in the<br />
>r produc-<br />
•e original<br />
returned<br />
s replacen<br />
started,<br />
»rder that<br />
ireviously<br />
in extraluests<br />
be<br />
at the<br />
The new<br />
lure and<br />
its a final<br />
acknowl-<br />
>rwise.<br />
ORDER STATUS<br />
Each new car order 5600A requires a status<br />
classification in one of these categories:<br />
Sold<br />
Stock<br />
Rental & Leasing<br />
Demo<br />
Code<br />
Sold orders will receive preference in production<br />
scheduling when there is a choice<br />
between a sold and stock order.<br />
TO EXPEDITE<br />
In addition to the above automatic priority,<br />
the most effective method for expediting<br />
urgently needed cars is through the medium<br />
of a Preference List.<br />
PRIORITY<br />
Order numbers should be listed in descending<br />
sequence based upon their relative importance.<br />
Do not group by body styles. Unsold orders,<br />
to balance stocks, should also be considered<br />
and listed. Mark the classification of each<br />
order according to one of the four order status<br />
categories.<br />
PRODUCTION NOTICE<br />
Do not list orders for which a notice of production<br />
has been received. This notice indicates<br />
that the car is in the final stages of assembly<br />
and no further action is required.<br />
S<br />
U<br />
R<br />
D<br />
FRIDAY MAILING<br />
Dealers should mail a new list every Friday.<br />
This is a desirable cycle, as it utilizes the weekend<br />
for transit.<br />
RE-LIST UNSCHEDULED ORDERS<br />
When received at the zone office, the new<br />
preference list will supersede the previous one;<br />
therefore, any orders for which production<br />
notices have not been received should be relisted.<br />
This presents an opportunity for revising<br />
the sequence of unscheduled orders as<br />
latest demands may dictate.<br />
REPLACEMENT ORDERS<br />
If a Replacement Order (especially a recent<br />
one) is being listed, a worth while precaution<br />
is to mention the date of the replacement order<br />
to prevent the original or previous order from<br />
being scheduled.<br />
OTHER MARKINGS<br />
Do not use the Preference List for other<br />
messages or requests to change specifications,<br />
as they are likely to be overlooked.<br />
SCHEDULING<br />
Subject to availability of materials, orders<br />
on the Preference List will be given priority in<br />
as nearly the sequence listed as possible.<br />
FORMS<br />
A supply of Preference Lists, form 1541A,<br />
is available upon request.<br />
73