23.03.2014 Views

Knowsley Replacement Unitary Development Plan - Knowsley Council

Knowsley Replacement Unitary Development Plan - Knowsley Council

Knowsley Replacement Unitary Development Plan - Knowsley Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HOUSING<br />

HOUSING<br />

MAKING EFFICIENT USE OF LAND<br />

5.27<br />

<strong>Plan</strong>ning Policy Guidance Note 3 “Housing” requires<br />

that (to ensure an efficient use of existing land and<br />

buildings) new dwellings should normally be provided<br />

at a minimum density of 30 units to the hectare.<br />

In considering any planning applications for housing<br />

development, the <strong>Council</strong> will expect this overall<br />

average to be maintained. It should be stressed<br />

however that:<br />

• For some sites (e.g. within or near town centres)<br />

higher densities of up to 50 or 60 dwellings<br />

per hectare will be appropriate;<br />

• In some exceptional circumstances,<br />

developments at lower densities may be required.<br />

Examples of where this may be the case include<br />

where the surrounding highway network<br />

constrains the number of dwellings to be<br />

accommodated, or in some circumstances where<br />

higher density development would damage the<br />

character of a Conservation Area.<br />

REGULATING WINDFALL PROVISION<br />

5.28<br />

Although table 5.1 anticipates considerable provision<br />

from windfall sources over the <strong>Plan</strong> period, it will be<br />

important to ensure that excessive releases from<br />

these sources (as defined in table 5.1) do not occur<br />

which could threaten the overall strategy in this<br />

chapter. Windfall releases on greenfield sites will be<br />

particularly discouraged unless (as referred to above)<br />

they form an integral part of wider regeneration<br />

proposals bringing significant social, economic or<br />

environmental benefits.<br />

5.29<br />

Sources of brownfield windfall development can<br />

include the following:<br />

• The re-use or conversion of empty dwellings or<br />

other existing buildings;<br />

• The sub-division of existing dwellings to<br />

form flats;<br />

• The provision of dwellings to replace demolition<br />

losses on the same site;<br />

• The re-use or redevelopment of vacant industrial<br />

or commercial properties;<br />

• Housing or live / work development as part of<br />

wider regeneration schemes in town centres.<br />

5.30<br />

In some parts of Merseyside, there has been<br />

significant recent pressure for various forms of<br />

windfall development, such as the demolition of<br />

single or semi-detached pairs of dwellings or of<br />

existing uses such as public houses, often in<br />

suburban areas, and replacement by high-density<br />

development such as blocks of flats. Such<br />

development can be regarded as an efficient use of<br />

land and therefore in some respects compliant with<br />

<strong>Plan</strong>ning Policy Guidance note 3. However, if it takes<br />

place to an excessive and unforeseen degree it can<br />

have the effect of prejudicing the overall achievement<br />

of the <strong>Plan</strong> strategy.<br />

5.31<br />

Therefore, as part of its overall monitoring of the rate<br />

of new housing development as a whole, the <strong>Council</strong><br />

will monitor the rate of release of windfall sites from<br />

brownfield sources. If it appears that windfall<br />

development is occurring at a rate which is<br />

threatening an over-provision, or diverting<br />

development pressures away from other priorities<br />

such as the regeneration of the Action Areas,<br />

constraints will be placed on the nature and the rate<br />

of release of “windfall” sites.<br />

PROCEDURES<br />

5.32<br />

The <strong>Council</strong> will monitor and manage the release of<br />

sites for housing development through decisions on<br />

planning applications. The way in which this is done<br />

must be sensitive to changing circumstances, such as<br />

variations in the rate of demolitions or of the rate of<br />

release of different types of housing development.<br />

To help it make decisions on planning applications,<br />

and to inform its wider regeneration functions, the<br />

<strong>Council</strong> will keep an up to date assessment of<br />

housing land availability and development trends.<br />

This will identify factors such as:<br />

• The overall rate of new development and<br />

demolitions (compared to RSS requirements);<br />

• Current site availability differentiated by type,<br />

location, market sector, quality etc.<br />

• Likely future trends in building and<br />

demolition rates;<br />

• The degree of “fit” between current site<br />

availability and the regeneration needs of<br />

the Borough.<br />

5.33<br />

The <strong>Council</strong> will produce a Supplementary <strong>Plan</strong>ning<br />

Document which will describe in detail the<br />

mechanism for controlling the release of housing<br />

land in accordance with the principles set out above.<br />

POLICY LINKS<br />

Policy H2<br />

“Sites allocated for housing development”<br />

Policy H3<br />

“North Huyton and Tower Hill, Kirkby Action Areas”<br />

Policy H4<br />

“<strong>Development</strong> Opportunity Site - Valley Road, Kirkby”<br />

Policy EC5<br />

“South Prescot Action Area”<br />

POLICY H2:<br />

SITES ALLOCATED FOR HOUSING DEVELOPMENT<br />

1. The sites listed below are allocated for housing<br />

development in the period up to 2016 and are<br />

shown on the Proposals Map:<br />

Estimated<br />

Size capacity<br />

Site (Hect- (No. of<br />

Ref Location ares) dwellings)<br />

H1 Former Bridgefield 8.3 250<br />

Forum site, Cartbridge<br />

Lane, Halewood<br />

H2 Former flats at 0.71 25<br />

62-100 Kipling Avenue,<br />

Huyton<br />

H3 Former Wingate Towers 2.3 70<br />

site, Alamein Road,<br />

Huyton<br />

H4 Land at Thingwall Lane, 18.0 350<br />

Huyton<br />

H5 Land adjacent to 0.9 30<br />

St Andrew’s Church Hall,<br />

Boundary Drive,<br />

Halewood<br />

H6 Quarryside Drive, Kirkby 0.58 17<br />

H7 Land at Delph Lane/ 2.2 60<br />

Two Butt Lane, Whiston<br />

H8 Trecastle Road, Kirkby 0.6 20<br />

Total for period up to 2016 822<br />

2. The <strong>Council</strong> will monitor and manage the<br />

release of these sites having regard to overall<br />

trends in housing supply and in accordance<br />

with the principles for the release of land for<br />

housing set by policy H1. If necessary<br />

(for example to ensure the focussing of<br />

available development within the Action Areas)<br />

the timing of release of the sites will be varied.<br />

38<br />

KNOWSLEY REPLACEMENT UNITARY DEVELOPMENT PLAN: Adopted June 2006<br />

KNOWSLEY REPLACEMENT UNITARY DEVELOPMENT PLAN: Adopted June 2006<br />

39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!