Atkins
Atkins
Atkins
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
12. NAME<br />
Gary Wingo, RA, LEED AP<br />
BD+C<br />
15. FIRM NAME AND LOCATION (City and State)<br />
<strong>Atkins</strong>, Orlando, FL<br />
16. EDUCATION (DEGREE AND SPECIALIZATION)<br />
B.A./Architecture and Environmental Design<br />
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />
13. ROLE IN THIS CONTRACT<br />
Quality Assurance/<br />
Quality Control<br />
a. TOTAL<br />
19<br />
14. YEARS EXPERIENCE<br />
b. WITH CURRENT FIRM<br />
4<br />
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)<br />
DC/Registered Architect<br />
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)<br />
Mr. Wingo has 19 years of intensive and sophisticated design, planning, and expert architectural detailing experience, with<br />
an in-depth understanding of multiple building types across a broad spectrum of design sectors including education, medical,<br />
hospitality, office, federal, military, and surface transit. He is particularly adept at BIM/four-dimensional (4-D) databasedriven<br />
modeling (Revit) and employs rapid techniques in real-time during conceptual design charrettes to streamline the<br />
decision-making process integrating programming, functional alternatives, sustainability, value engineering, and costeffective<br />
betterments across all design disciplines. He consistently demonstrates an effective combination of intuitiveness,<br />
enthusiasm, and commitment to achieve high design value for each client and aesthetic excellence on each project.<br />
a.<br />
(1) TITLE AND LOCATION (City and State)<br />
Collier Area Transit Intermodal Hub<br />
Naples, FL<br />
19. RELEVANT PROJECTS<br />
PROFESSIONAL SERVICES<br />
2012<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
2012<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />
Project Architect. Responsible for coordinating, producing, and delivering schematic design through construction<br />
documents and providing full architectural construction administration for this new intermodal transfer station. Design<br />
development is currently underway.<br />
b.<br />
c.<br />
d.<br />
(1) TITLE AND LOCATION (City and State)<br />
Lynx Central Station<br />
Orlando, FL<br />
PROFESSIONAL SERVICES<br />
2004<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
2004<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm<br />
Project Architect. Responsible for coordinating, producing, and delivering schematic design through construction<br />
documents and providing full architectural construction administration for this $25 million regional transportation<br />
headquarters and passenger terminal project.<br />
(1) TITLE AND LOCATION (City and State)<br />
Lynx New Operations Base<br />
Orlando, FL<br />
PROFESSIONAL SERVICES<br />
2006<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
2006<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm<br />
Project Architect. Responsible for coordinating, producing, and delivering construction documents for the Lynx New<br />
Operations Base complex. This significant assignment involved providing replacement technical services, construction<br />
documents, specifications and details in lieu of an original design team’s submitted work.<br />
(1) TITLE AND LOCATION (City and State)<br />
Lynx Light Rail Transit Operations Control Center<br />
Orlando, FL<br />
PROFESSIONAL SERVICES<br />
1999<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
N/A<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm<br />
Project Architect. Responsible for coordinating the planning and design production for the 100,000-sf, $25 million<br />
light rail vehicle maintenance facility. Facility included high-bay maintenance platforms, miscellaneous component<br />
shops, paint and clean facilities, and an operations control center for the entire light rail system.<br />
e.<br />
(1) TITLE AND LOCATION (City and State)<br />
Central Florida Light Rail Transit System<br />
Orlando, FL<br />
PROFESSIONAL SERVICES<br />
2006<br />
(2) YEAR COMPLETED<br />
CONSTRUCTION (If Applicable)<br />
Ongoing<br />
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm<br />
Project Architect. Responsible for coordinating, planning, and design production of 17 stations along this 14.6-mile,<br />
$548 million proposed light rail system. Station facilities included six pedestrian bridges, two aerial platforms, and<br />
station canopy/amenity design responding to five unique urban districts along the alignment.<br />
0301.028681.0612 STANDARD FORM 330 (6/2004) E-13