21. TITLE AND LOCATION (City and State)<br />

City of Homestead General Engineering Consultant<br />

(GEC) Services, Homestead, FL<br />

a. PROJECT OWNER<br />

City of Homestead<br />

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED<br />

TEAM’S QUALIFICATIONS FOR THIS CONTRACT<br />

PROFESSIONAL SERVICES<br />

2012<br />

23. PROJECT OWNER’S INFORMATION<br />

b. POINT OF CONTACT NAME<br />

Mr. Scott Bell<br />

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)<br />

<strong>Atkins</strong> has been providing the City of Homestead with general<br />

engineering consultant services for the past five years. Services being<br />

provided include architectural; mechanical, electrical, and structural<br />

engineering; landscape architecture; and interior design for<br />

remodeling/renovation projects on an as-needed basis. Task assignments<br />

included design of monument signage, planning and concept design for a<br />

new city shooting range, and design of a fire fighting training facility.<br />

New City Hall Cost Estimating and Constructability Review Support<br />

Services. <strong>Atkins</strong> provided cost estimating and constructability review<br />

services for the City’s new city hall facility. The new facility is a threestory,<br />

79,580-sf structure, housing the city’s administrative and operations<br />

offices, and organized around an emergency operations center that is<br />

designed to withstand Category 5 hurricanes.<br />

22. YEAR COMPLETED<br />

Project summary<br />

Size: Varies<br />

Project fee: $1M<br />

Key project elements<br />

• Master planning<br />

• Architectural design<br />

• MEP engineering<br />

• Structural engineering<br />

• Landscape architecture<br />

• Civil engineering<br />

• Roof replacements<br />

• Cost estimating<br />

• Interior design<br />

20. EXAMPLE PROJECT<br />

KEY NUMBER 7<br />

CONSTRUCTION (if Applicable)<br />

N/A<br />

c. POC TELEPHONE NUMBER<br />

305.310.9016<br />

Homestead Welcome Signs. <strong>Atkins</strong> provided A-E services related to the design and construction documents for welcome<br />

signs. These signs were placed in four designated entry points into the city. The team completed topographic surveys to<br />

ascertain certain details that may impede or improve the area for each signs placement. Civil engineering services included<br />

a conceptual site design to determine if irrigation and lighting was required for each sign. Members of the team focused on<br />

the architectural aspects including each signs design and general construction methods. Each sign was placed at its agreed<br />

upon location within the scheduled budget and time.<br />

Police Station AC. This project included the evaluation of four technical specifications and air conditioner replacements at<br />

two facilities inclusive of equipment lifetime expectancy.<br />

Mechanical Assessment. <strong>Atkins</strong> provided the City with a detailed scope of work to assess the replacement/repair of an air<br />

conditioning unit for one of the City’s buildings. The team member was able to expedite the process to allow the City to<br />

make all repairs in a timely manner.<br />

Design Services to Repair Roof at Police Headquarters. The <strong>Atkins</strong> team is providing engineering review and design<br />

services to repair the roof at the police headquarters. <strong>Atkins</strong> will complete the project in two phases. The first phase<br />

includes the evaluation of the existing roof to determine the needed repairs. The second phase includes design and<br />

construction administration. Upon the completion of the roof repair, <strong>Atkins</strong> will perform a substantial inspection and<br />

participate in a post construction conference.<br />

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT<br />

(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE<br />

a. <strong>Atkins</strong> Miami, FL Architecture; MEP engineering<br />

0301.028681.0612 STANDARD FORM 330 (6/2004) F-29