01.07.2014 Views

Atkins

Atkins

Atkins

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

12. NAME<br />

Pelayo Calante, PE, LEED AP<br />

15. FIRM NAME AND LOCATION (City and State)<br />

<strong>Atkins</strong>, Miami, FL<br />

16. EDUCATION (DEGREE AND SPECIALIZATION)<br />

M.S./Nuclear Engineering; B.S./Nuclear Engineering<br />

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

13. ROLE IN THIS CONTRACT<br />

Mechanical Engineering<br />

a. TOTAL<br />

28<br />

14. YEARS EXPERIENCE<br />

b. WITH CURRENT FIRM<br />

3<br />

17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)<br />

FL/Professional Engineer<br />

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)<br />

Mr. Calante has 28 years of extensive experience in the fields of mechanical, nuclear, civil and environmental engineering,<br />

quality control, and design and project management. His varied career includes work as a mechanical engineer, nuclear<br />

engineer, civil engineer, environmental engineer, and associate professor where he taught courses in nuclear power plants<br />

and the construction and assembly of nuclear power plants. He has extensive knowledge of Florida Building codes and<br />

other design codes including the National Fire Protection Association (NFPA); American Society of Heating, Refrigerating,<br />

and Air Conditioning Engineers (ASHRAE); and American Society of Mechanical Engineers (ASME). Mr. Calante is<br />

responsible for the management and/or production of mechanical/electrical/plumbing (MEP)-related projects.<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) TITLE AND LOCATION (City and State)<br />

South Pointe Pier Park Design and Construction<br />

Administration Services, Miami Beach, FL<br />

19. RELEVANT PROJECTS<br />

PROFESSIONAL SERVICES<br />

2012<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

Ongoing<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

MEP Engineer. Responsible for plumbing design. <strong>Atkins</strong> is developing a new design and providing construction<br />

administration services for the South Pointe Park Pier. This project consists of demolition of the existing +10,000-sf<br />

fishing pier and installation of a new pier supported by more than 60 reinforced concrete piles with the footprint of the<br />

non-serviceable pier.<br />

(1) TITLE AND LOCATION (City and State)<br />

USACE Savannah, D-B MATOC Tactical Equipment<br />

Maintenance Facility (TEMF), Fort Benning, GA<br />

PROFESSIONAL SERVICES<br />

2011<br />

(2) YEAR COMPLETED<br />

CONSTRUCTION (If Applicable)<br />

2011<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Mechanical Engineer. Responsible for providing mechanical design support in accordance with ASHRAE Standard<br />

90.1, USGBC LEED version 2.2, and EPAct 2005, including engineering/design reviewing/performance of<br />

heating/cooling load calculations. Services included architectural, fire protection, interior, landscape, mechanical,<br />

electrical, and plumbing (MEP), security (AT/FP), site/civil, and sustainable design (LEED Silver)—all designs were created<br />

utilizing Bentley BIM.<br />

(1) TITLE AND LOCATION (City and State)<br />

Miami Culinary Institute at Miami Dade College<br />

(MDC), Miami, FL<br />

PROFESSIONAL SERVICES<br />

2011<br />

(2) YEAR COMPLETED<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

CONSTRUCTION (If Applicable)<br />

2011<br />

Lead MEP Engineer. Coordinated all disciplines (MEP and fire alarm/fire protection) for a new 8-story, 35,000-sf<br />

building. This urban infill building incorporates offices and classrooms, teaching labs, TV production studio, and a<br />

commercial restaurant. Work performed included the plumbing and fire protection engineer-of-record. All systems<br />

were coordinated to pursue LEED-New Construction (NC) Gold certification.<br />

(1) TITLE AND LOCATION (City and State)<br />

Grand Turk Welcome Center<br />

Turks and Caicos Islands<br />

PROFESSIONAL SERVICES<br />

2011<br />

(2) YEAR COMPLETED<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

CONSTRUCTION (If Applicable)<br />

2012<br />

Mechanical Engineer. Responsible for MEP design. <strong>Atkins</strong> provided professional design services to the Grand Turk<br />

Cruise Center for a new, one-story welcome center facility, located on a 30,000-sf site. In addition, <strong>Atkins</strong> provided<br />

professional services for design and construction documents for shell-only buildings, except for a full build-out of the<br />

public restrooms, including HVAC. The project will be developed in four phases: conceptual design with renderings;<br />

design development documents for local government planning review; construction documents and bidding support<br />

services; and construction administration.<br />

(1) TITLE AND LOCATION (City and State)<br />

(2) YEAR COMPLETED<br />

Plans Review and Inspection Services, Miami Dade PROFESSIONAL SERVICES<br />

CONSTRUCTION (If Applicable)<br />

College (MDC), Miami, FL<br />

2010<br />

N/A<br />

(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm<br />

Mechanical Engineer. Performed code-related plan reviews and inspection services for various projects for all MDC<br />

campuses. Assignments included the renovation of the gymnasium at the North Campus, Building 400, which consisted<br />

of reviewing the Phase III documents and performing inspections based on FBC; and plan reviews and code-inspection<br />

services for the SET and BURN buildings at the North Campus.<br />

0301.028681.0612 STANDARD FORM 330 (6/2004) E-16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!