01.07.2014 Views

Atkins

Atkins

Atkins

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

H. ADDITIONAL INFORMATION<br />

revised document and verifies with a green checkmark that the<br />

appropriate changes were made.<br />

The final step is QA, performed by the designated QA/QC<br />

manager, verifying that the five-step process was appropriately<br />

performed and authorizing the release of the work product.<br />

<strong>Atkins</strong> understands the importance of maintaining the project<br />

schedule on all assignments that may be given through<br />

this contract. Our firm’s successful history is integrally tied<br />

to meeting schedules. Our staff will work with the project<br />

controls group to assist in developing a cost estimate and<br />

project schedule for the design and implementation of all<br />

assignments. Our project controls group has maintained<br />

successful results when engaged by our clients by performing<br />

the following steps:<br />

• Begin with a clearly defined program and problem<br />

statement.<br />

• Involve decision makers.<br />

• Schedule weekly meetings with clearly defined agendas<br />

and action items. Include the cost consultant/contractor<br />

early on to establish and confirm budgets.<br />

• Establish and adhere to project milestones.<br />

• Provide adequate time for review and design response to<br />

review.<br />

Our team will work with the City to identify a detailed<br />

schedule. Once the scope and tasks are approved by<br />

the owner, a comprehensive scheduling work session<br />

will be conducted to provide all participants with a clear<br />

understanding of schedule requirements, responsibilities, and<br />

interface commitments. The schedule will be developed and<br />

analyzed to identify all participants in the planning process,<br />

define anticipated activities, verify established target dates and<br />

milestones, and establish and coordinate activity timeliness and<br />

interface requirements.<br />

Job progress and schedules are fixed agenda items for all<br />

progress meetings. During these meetings, the progress of<br />

each discipline will be discussed to facilitate coordination,<br />

eliminate obstacles, and determine additional resources that<br />

may be required. When appropriate, techniques such as lookahead<br />

schedules for the coming week’s activities, summaries<br />

of action items and assignments, and recovery schedules may<br />

be developed to meet schedule requirements. Ultimately, it is<br />

the project manager’s responsibility to maintain the schedule<br />

and keep the client informed on project progress.<br />

<strong>Atkins</strong> believes in a proactive design approach. This<br />

means the City of North Miami Beach will be vital<br />

members of the development team. Your input is<br />

imperative for a successful project. Maintaining the schedule<br />

is a team effort; it is not solely driven by the consultant.<br />

Decisions, input, and milestone reviews will be handled in a<br />

timely manner. Working together, we can maintain even the<br />

most aggressive schedule. For example, <strong>Atkins</strong>’ South Pointe<br />

Park Fishing Pier project required a turnaround on 100-percent<br />

design documents within 120 days of issuance of the notice<br />

to proceed. A true testament of the in-house capabilities of<br />

<strong>Atkins</strong>, our services have included structural, mechanical, and<br />

electrical engineering; civil engineering; architecture design;<br />

landscape architecture; and cost estimating. We will also<br />

provide construction administration later this year.<br />

Coordination with permitting entities and the public.<br />

<strong>Atkins</strong>’ staff has extensive permitting experience with<br />

numerous municipal projects throughout the state including<br />

land management, transportation, stormwater management,<br />

and utility improvements. Our team is intimately familiar<br />

with federal, state, and local permitting regulations and<br />

requirements for the various agencies that may have<br />

jurisdiction over the assignments issued under this services<br />

contract. We have strong relationships and a successful<br />

permitting track record with many such agencies including<br />

Florida Department of Environmental Protection, Miami-Dade<br />

County, Florida Department of Transportation, SFWMD, and<br />

U.S. Army Corps of Engineers.<br />

Our team’s experience is unmatched in handling the community<br />

participation and public involvement portion of projects<br />

from the early stages of planning through design and construction.<br />

<strong>Atkins</strong> offers full-service support inhouse to generate<br />

and reproduce all types of graphics, exhibits, presentations,<br />

newsletters, video-simulation, modeling, before-and-after<br />

photos, website creation and maintenance, news releases,<br />

advertisements, and press kits. Our technical management and<br />

construction professionals are well-versed in responding to<br />

questions from community members and making sure that the<br />

entire community is involved in developing the potential range<br />

of solutions to be studied for the duration of the project. We<br />

can successfully handle these efforts to the degree desired by<br />

the City of North Miami Beach.<br />

Scheduling methodology. <strong>Atkins</strong> understands the<br />

importance of maintaining the project schedule on all<br />

assignments that may be given through this contract. Our<br />

firm’s successful history is integrally tied to meeting schedules.<br />

Our staff will work with the project controls group to develop<br />

a cost estimate as well as project schedule for the design and<br />

implementation of all assignments. The project controls group<br />

has maintained successful results for both our clients and our<br />

in-house architects and engineers.<br />

0301.028681.0612<br />

STANDARD FORM 330 (6/2004) | H-35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!