- Page 1 and 2:
Continuing Contract for Professiona
- Page 3 and 4:
Date: June 22, 2012 Subject: RFQ No
- Page 5 and 6:
Contents Section A: Title Page 1 Se
- Page 8 and 9:
Executive summary An introduction t
- Page 10 and 11:
The Atkins team is enhanced by the
- Page 12 and 13:
Electrical engineering. Pedro Trevi
- Page 14 and 15:
SF330 Part I SF330 Part I
- Page 16 and 17:
Principal-in-Charge Humberto Alonso
- Page 18 and 19:
12. NAME Larry Levis, AIA 15. FIRM
- Page 20 and 21:
12. NAME Douglas Ramirez, PE 15. FI
- Page 22 and 23:
12. NAME Pelayo Calante, PE, LEED A
- Page 24 and 25:
12. NAME Bernardo Bieler, PE 15. FI
- Page 26 and 27:
12. NAME Harry Belton, RLA 15. FIRM
- Page 28 and 29:
12. NAME Alex Montenegro, PE 15. FI
- Page 30 and 31:
21. TITLE AND LOCATION (City and St
- Page 32 and 33:
21. TITLE AND LOCATION (City and St
- Page 34 and 35:
21. TITLE AND LOCATION (City and St
- Page 36 and 37:
21. TITLE AND LOCATION (City and St
- Page 38 and 39:
21. TITLE AND LOCATION (City and St
- Page 40 and 41:
H. ADDITIONAL INFORMATION 30. PROVI
- Page 42 and 43:
H. ADDITIONAL INFORMATION Financial
- Page 44 and 45:
H. ADDITIONAL INFORMATION Engineeri
- Page 46 and 47: H. ADDITIONAL INFORMATION 0301.0286
- Page 48 and 49: H. ADDITIONAL INFORMATION Personnel
- Page 50 and 51: H. ADDITIONAL INFORMATION Bernardo
- Page 52 and 53: H. ADDITIONAL INFORMATION Pelayo Ca
- Page 54 and 55: H. ADDITIONAL INFORMATION Herminio
- Page 56 and 57: SF330 Part II SF330 Part II
- Page 58 and 59: ARCHITECT - ENGINEER QUALIFICATIONS
- Page 60 and 61: ARCHITECT-ENGINEER QUALIFICATIONS P
- Page 62 and 63: Addenda Addenda
- Page 64 and 65: City of North Miami Beach | 55
- Page 66 and 67: City of North Miami Beach | 57
- Page 68 and 69: City of North Miami Beach | 59
- Page 70 and 71: City of North Miami Beach | 61
- Page 72 and 73: City of North Miami Beach | 63
- Page 74 and 75: City of North Miami Beach | 64
- Page 76 and 77: City of North Miami Beach | 66
- Page 78 and 79: City of North Miami Beach | 68
- Page 80 and 81: City of North Miami Beach | 70
- Page 82 and 83: City of North Miami Beach | 72
- Page 84 and 85: RFQ No. 2012-10 Continuing Contract
- Page 86 and 87: City of North Miami Beach | 76
- Page 88 and 89: City of North Miami Beach | 78
- Page 90 and 91: City of North Miami Beach | 80
- Page 92 and 93: RFQ No. 2012-10 Continuing Contract
- Page 94 and 95: City of North Miami Beach | 84
- Page 98: www.atkinsglobal.com/northamerica 0