11.07.2014 Views

Central California Ozone Study (CCOS) - Desert Research Institute

Central California Ozone Study (CCOS) - Desert Research Institute

Central California Ozone Study (CCOS) - Desert Research Institute

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CCOS</strong> Field Operations Plan Version 2: 5/31/00<br />

Table 7.3-1<br />

<strong>CCOS</strong> Contracts and Other Costs<br />

Project Organization Principal Investigator Amount<br />

Upper-air meteorology NOAA-ETL Bill Neff $ 570,000<br />

Suface and upper-air meteorology NOAA-ARL Jerry Cresenti $ 122,801<br />

Upper-air meteorology STI Tim Dye $ 425,000<br />

Rawinsonde and ozonesondes T&B Systems Don Lehrman $ 195,125<br />

Sodar and met station operations PG&E Sam Altshuller $ 19,800<br />

Sonic Anemometer UCD $ 7,700<br />

Monitoring site set up ENSR Chuck McDade $ 232,000<br />

<strong>CCOS</strong> field operations/contingency DRI John Bowen $ 672,000<br />

Equipment purchase JPA $ 1,382,000<br />

<strong>CCOS</strong> field operations T&B Systems Don Lehrman $ 47,451<br />

<strong>CCOS</strong> field operations UC Riverside Denis Fitz $ 62,916<br />

<strong>CCOS</strong> field operations UC Berkeley Rob Harley $ 17,000<br />

NOx, NH3, formaldehyde CE-CERT Denis Fitz $ 288,000<br />

ELIGHT (<strong>Ozone</strong> Lidar) ELIGHT $ 11,000<br />

Bay Area AQ and Met T&B Systems Don Lehrman $ 254,461<br />

Aircraft measurements UCD John Carrol $ 355,000<br />

Aircraft measurements STI Don Blumenthal $ 483,150<br />

Aircraft measurements (plume study) TVA Roger Tanner $ 253,437<br />

Twin Otter rental for plume study JPA $ 57,488<br />

VOC Canister Analysis BRC Rei Rasmussen $ 307,000<br />

Automated VOC measurements DRI Barbara Zielinska $ 419,187<br />

VOC Canister Analysis DRI Barbara Zielinska $ 346,316<br />

Carbonyl measurements AtmAA Kochy Fung $ 318,850<br />

Planning and Field Management DRI Eric Fujita $ 150,000<br />

Quality Assurance Parsons Eng Dave Bush $ 200,000<br />

ARB-MLD travel funds for QA audits ARB-MLD Mike Miguel $ 23,000<br />

Data Management $ 75,000<br />

Data validation DRI Eric Fujita $ 160,000<br />

Biogenic Emissions UC Extension $ 80,000<br />

District assistance - emission inventory UC Davis $ 40,000<br />

Power Plant source sampling UCR CE-CERT Denise Fitz $ 38,511<br />

Area source emissions/district assistance STI Lyle Chinkin $ 210,000<br />

Traffic counts UCD Debra Neimier $ 275,000<br />

Plume modeling AER Christian Seigneur $ 19,800<br />

Retrospective SIP Envair Phil Roth $ 50,000<br />

Totals $ 8,168,993<br />

Chapter 7: MANAGEMENT, SCHEDULE, AND BUDGET 7-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!