11.07.2014 Views

Central California Ozone Study (CCOS) - Desert Research Institute

Central California Ozone Study (CCOS) - Desert Research Institute

Central California Ozone Study (CCOS) - Desert Research Institute

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CCOS</strong> Field Operations Plan (DRAFT) Version 2: 5/31/00<br />

NOY/NOY* analyzers. Each O3 analyzer that is installed as part of <strong>CCOS</strong> will be challenged<br />

with zero air followed by with ozone concentrations near 400 ppb and 90 ppb to cover the span<br />

and precison levels, respectively. Each NO/NOX, NO/NOY, and NOY/NOY* will be<br />

challenged with zero air followed by NO concentrations near 400 ppb and 90 ppb to cover the<br />

span and precision levels, respectively. A mixture of NO at 30 ppb and NO2 at 60 ppb will be<br />

generated by gas phase titration to check the converter efficiency of the NO/NOX, NO/NOY,<br />

and NOY/NOY* analyzers. Data from calibration checks will be retrieved and reviewed daily.<br />

The <strong>CCOS</strong> supplemental surface air quality and meteorological measurement sites will<br />

be operated by personnel from <strong>Desert</strong> <strong>Research</strong> <strong>Institute</strong>, T&B Systems, University of <strong>California</strong><br />

Berkeley, <strong>California</strong> Air Resources Board, Bay Area AQMD, Sacramento Metropolitan APCD,<br />

San Joaquin Valley Unified APCD, San Luis Obispo County APCD or the Shasta County<br />

APCD. Table 2.4-5 provides a summary of the tasks required of local site operators at each type<br />

of supplemental site (S0, S1, S2 or R).<br />

DRI will be responsible for operating the White Cloud (S1) and Granite Bay (R) sites. DRI<br />

personnel will make weekly visits to the Granite Bay <strong>Research</strong> site to perform maintenance tasks<br />

and to do a visual check of the instruments. Personnel will operate the VOC canisters and<br />

carbonyl cartridges during IOP’s. They will install canisters and cartridges the day before the<br />

IOP starts, change canisters and cartridges each day, and remove the final samples at the end of<br />

the IOP. They will send the filled canisters and exposed cartridges to the proper parties at the<br />

expense of separate contracts. They will also perform minor repairs at the direction of the project<br />

manager or designee.<br />

T&B will be responsible for operating the Bodega Bay (S1), Turlock (S1), and Pecheco<br />

Pass (S2) sites. Personnel will make weekly visits to the Pecheco Pass site to perform<br />

maintenance tasks (e.g., fill reagent reservoirs for NO 2 /PAN and HCHO analyzers) and to do a<br />

visual check of the instruments. Personnel will operate the VOC canisters and carbonyl<br />

cartridges during IOP’s. They will install canisters and cartridges the day before the IOP starts,<br />

change canisters and cartridges each day, and remove the final samples at the end of the IOP.<br />

They will send the filled canisters and exposed cartridges to the proper parties at the expense of<br />

separate contracts. Personnel will also be available for emergency site visits to investigate<br />

problems found during data review. They will also perform minor repairs at the direction of the<br />

project manager or designee.<br />

UCB will be responsible for operating the Sunol (R) and Altamont (S2) sites. Personnel<br />

will make weekly visits to both sites to perform maintenance tasks (e.g., fill reagent reservoirs<br />

for NO 2 /PAN and HCHO analyzers) and to do a visual check of the instruments. Personnel will<br />

operate the VOC canisters and carbonyl cartridges during IOP’s. They will install canisters and<br />

cartridges the day before the IOP starts, change canisters and cartridges each day, and remove<br />

the final samples at the end of the IOP. They will send the filled canisters and exposed<br />

cartridges to the proper parties at the expense of separate contracts. Personnel will also be<br />

available for emergency site visits to investigate problems found during data review. They will<br />

also perform minor repairs at the direction of the project manager or designee.<br />

Personnel from the <strong>California</strong> Air Resources Board and local districts (BAAQMD,<br />

SJVAPCD, Shasta County APCD, SLOAPCD) will provide operational support for the other<br />

Chapter 2: FIELD MEASUREMENTS 2-30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!