11.07.2014 Views

Central California Ozone Study (CCOS) - Desert Research Institute

Central California Ozone Study (CCOS) - Desert Research Institute

Central California Ozone Study (CCOS) - Desert Research Institute

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CCOS</strong> Field Operations Plan Version 2: 5/31/00<br />

Table 2.4-1<br />

<strong>CCOS</strong> Supplemental Surface Measurements<br />

Code Observable and Method Period Site Types<br />

Equipment<br />

Procurement<br />

& Testing<br />

Equipment<br />

Installation<br />

and Training<br />

Laboratory<br />

Analysis<br />

A Surface Meteorology (WS,WD, T and RH) at 10 m 6/15/00 to 9/15/00 S0, S1, S2, R NOAA NOAA --<br />

B <strong>Ozone</strong> (ultraviolet absorption monitor) 6/15/00 to 9/15/00 S0, S1, S2, R DRI DRI --<br />

C Trace level NO, NOx (chemiluminescent monitor) 6/15/00 to 9/15/00 R CE-CERT CE-CERT/DRI --<br />

D<br />

E<br />

NO, NOy (high sensitivity chemiluminescent monitor with<br />

external converter)<br />

NOy, NOy-HNO 3 (high sensitivity chemiluminescent monitor<br />

with dual converters w/ & w/o NaCl impregnated fiber denuder)<br />

6/15/00 to 9/15/00 S0, S1, S2 CE-CERT CE-CERT/DRI --<br />

6/15/00 to 9/15/00 R CE-CERT CE-CERT --<br />

F NO 2<br />

, PAcNs (GC - Luminol) 7/2/00 to 9/2/00 S2, R CE-CERT CE-CERT --<br />

G NO 3<br />

-<br />

(flash vaporization) 7/2/00 to 9/2/00 R CRPAQS/AD AD/DRI --<br />

H CO (nondispersive infrared) 6/15/00 to 9/15/00 R DRI DRI --<br />

I CO 2 (nondispersive infrared) 6/15/00 to 9/15/00 R DRI DRI --<br />

J; J' CO, CO2, CH4, C 2 -C 12 hydrocarbons (canister/GC-FID); 55<br />

target HC and NMOC for PAMS<br />

15 IOP days S1, S2; PAMS DRI/BRC DRI/BRC DRI/BRC &<br />

ARB for PAMS<br />

K C 8 -C 20 hydrocarbons (Tenax GC-FID, MSD) 15 IOP days R DRI DRI DRI<br />

L VOC (Automated-GC/ion trap mass spectrometer) 7/2/00 to 9/2/00 R DRI DRI DRI<br />

M HCHO (dihydrolutinine derivative/fluorescent detection) 7/2/00 to 9/2/00 S2, R CE-CERT CE-CERT --<br />

N; N' C 1<br />

-C 7<br />

carbonyls( DNPH-HPLC/UV); C 1<br />

-C 2<br />

for PAMS 15 IOP days S1, S2; PAMS AtmAA AtmAA AtmAA &<br />

ARB for PAMS<br />

P NO 2<br />

, HNO 3<br />

(TDLAS) 15 IOP days R (Parlier) CE-CERT CE-CERT --<br />

Q H 2<br />

O 2,<br />

HCHO (TDLAS) 15 IOP days R (Parlier) CE-CERT CE-CERT --<br />

R PM2.5 light absorption (aethalometer) 6/15/00 to 9/15/00 R CRPAQS/DRI DRI --<br />

S PM2.5 light scattering (portable nephelometer) 6/15/00 to 9/15/00 R CRPAQS/DRI DRI --<br />

T Scanning Radiometers 6/15/00 to 9/15/00 R DRI DRI --<br />

U PM2.5 mass (beta attenuation) 12/1/99 to 1/31/01 CRPAQS Anchor CRPAQS CRPAQS --<br />

V PM10 mass (beta attenuation) 12/1/99 to 1/31/02 CRPAQS Anchor CRPAQS CRPAQS --<br />

W PM2.5 Organic and Elemental Carbon 12/1/99 to 1/31/03 CRPAQS Anchor CRPAQS CRPAQS --<br />

Chapter 2: FIELD MEASUREMENTS 2-14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!