<strong>TAV</strong> AIRPORTS HOLDING AND <strong>IT</strong>S SUBSIDIARIES<br />
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS<br />
AS AT AND FOR THE YEAR ENDED 31 DECEMBER 2008<br />
(Amounts expressed in Euro unless otherwise stated)<br />
İzmir Adnan Menderes International Airport<br />
A BOT agreement was executed between <strong>TAV</strong> İzmir and DHMİ on 20 May 2005 regulating the reconstruction, investment and<br />
operations of the İzmir Adnan Menderes Airport International Terminal. According to the Agreement, <strong>TAV</strong> İzmir was required to<br />
complete the construction within 24 months after the agreement date and would then have the right to operate the facilities of the<br />
İzmir Adnan Menderes Airport International Terminal for a period of 6 years, 7 months and 29 days. An addendum to the Agreement<br />
was signed on 21 August 2006. Under the terms of the addendum, in return for additional works, the operation period of <strong>TAV</strong> İzmir<br />
was extended by 11 months 17 days through January 2015. <strong>TAV</strong> İzmir has started to provide mainly passenger, ramp and check-in<br />
counter services on 13 September 2006.<br />
Tbilisi International Airport<br />
A BOT agreement was executed between <strong>TAV</strong> Tbilisi and JSC on 6 September 2005 for the operations of airport (both international,<br />
domestic terminals and parking-apron-taxi ways). The BOT agreement undertakes the design, engineering, financing, construction,<br />
testing, commissioning and maintenance of the new terminal for Tbilisi International Airport, for an initially agreed term of 10<br />
years and 6 months from the commencement date of the new terminal operations. Subsequently, this period was extended by<br />
another 9.5 years in exchange for an obligation by the Company to invest an additional amount for the construction of the terminal<br />
(including construction of additional runways, extension of apron etc.) for Batumi airport. <strong>TAV</strong> Tbilisi has started to provide all<br />
airport activities such as passenger, ramp, check-in counter services and parking-apron-taxi services excluding air traffic services in<br />
New Tbilisi International Airport on 8 February 2007.<br />
Batumi International Airport<br />
On 9 August 2007, <strong>TAV</strong> Batumi Operations signed an agreement with the Georgian Ministry of Economic Development to transfer<br />
the management rights of all shares of the Batumi Airport LLC to <strong>TAV</strong> Batumi for 20 years. According to such share management<br />
agreement, all airport operations (excluding only the air traffic control and aviation security services) of the Batumi International<br />
Airport will be carried out by <strong>TAV</strong> Batumi until August 2027. The air traffic control and aviation security services will strictly be<br />
under Georgian Government’s responsibility.<br />
Tunisie Monastir and Enfidha International Airports<br />
A BOT agreement was executed between <strong>TAV</strong> Tunisie and OACA on 18 May 2007, for the operation of existing Monastir Habib<br />
Bourguiba Airport and new Enfidha Airport (International, domestic terminals and parking-apron-taxi-ways) which is planned to be<br />
constructed in two years. Through the BOT agreement <strong>TAV</strong> Tunisie undertakes the operation of existing Monastir Habib Bourguiba<br />
Airport and design, engineering, financing, construction, testing, commissioning and maintenance of the new terminal of Enfidha<br />
Airport. The operation of Enfidha Airport will be undertaken following the completion of the construction by 1 October 2009. The<br />
operation of Monastir Habib Bourguiba Airport was undertaken on 1 January 2008. The concession periods of both airports will end<br />
in May 2047. The operation of the Monastir and Enfidha Airports will cover all airport activities such as passenger handling, ramp,<br />
check-in counter services, ground handling, cargo and parking apron taxi services excluding air traffic services.<br />
Gazipaşa Airport<br />
Relating to the transfer of the operational rights of Antalya-Gazipaşa Airport via a lease, the concession agreement between the<br />
new company, named <strong>TAV</strong> Gazipaşa Yapım, Yatırım ve İşletme A.Ş. and DHMİ was signed on 4 January 2008. The operation period of<br />
Antalya-Gazipaşa Airport, which currently has 500,000 annual passenger capacity, is 25 years, and the operation of the airport will<br />
cover activities within airside and landside facilities and area of runway, apron and taxiway. <strong>TAV</strong> Gazipaşa shall make an annual rent<br />
payment of US$ 50,000 plus VAT as a fixed amount, until the end of the operation period; as well as a share of 65% of the net profit<br />
to DHMİ.