- Page 1 and 2:
MEXICO, SUPPORT FOR THE DEVELOPMENT
- Page 3 and 4:
IV.1.2 PROJECT RECEPTION AND CDM DE
- Page 5 and 6:
LIST OF ACRONYMS Acronym AEAEE Asso
- Page 7 and 8:
IEA International Energy Agency IET
- Page 9 and 10:
BOXES, TABLES AND FIGURES Boxes: Bo
- Page 11 and 12:
Mexico is one of the selected devel
- Page 13 and 14:
Figure 1. Percentage emissions CO 2
- Page 15 and 16:
Carbon CFE 2,600 5.6 Geothermal CFE
- Page 17 and 18:
In addition to the increase in effi
- Page 19 and 20:
On other hand, the international me
- Page 21 and 22:
I.1.- REVIEW AND LISTING OF CDM STA
- Page 23 and 24:
National Commission on Foreign Inve
- Page 25 and 26:
Private sector enterprises Multiple
- Page 27 and 28:
Ecosecurities Empresas ESM SA DE CV
- Page 29 and 30:
North American Commission for Envir
- Page 31 and 32:
Energy saving and Cogeneration Is o
- Page 33 and 34:
Fuel-switching Is a priority area i
- Page 35 and 36:
• Biomass and biofuels Is a prior
- Page 37 and 38:
Scudder Latin American Power Fund (
- Page 39 and 40:
• Construction Is a priority area
- Page 41 and 42:
Industry Is a priority area in the
- Page 43 and 44:
I.1.3.- COOPERATION WITH AUSTRIA Au
- Page 45 and 46:
Austrian Organizations 66 Kommunalk
- Page 47 and 48:
cannot contradict the Federal Laws.
- Page 49 and 50:
• Exploration, exploitation, refi
- Page 51 and 52:
The following diagram describes the
- Page 53 and 54:
A proposal has been recently presen
- Page 55 and 56:
Policy barriers The energy transiti
- Page 57 and 58:
Development within the Federal Gove
- Page 59 and 60:
SEMARNAT counts with several depend
- Page 61 and 62:
I.3.- INTERMINISTERIAL COMMISSION O
- Page 63 and 64:
Appointed by the President of the C
- Page 65 and 66:
The project design document (PDD),
- Page 67 and 68:
Mexican procedural sequence for pro
- Page 69 and 70:
• Production of a Project Idea No
- Page 71 and 72:
Is to be noted that the certificati
- Page 73 and 74:
Of the 22 projects at present in th
- Page 75 and 76:
13 AWMS GHG Mitigation Project MX05
- Page 77 and 78:
Mexican CDM projects at the interna
- Page 79 and 80: National Institute of Ecology, INE
- Page 81 and 82: • Approved Environmental Impact A
- Page 83 and 84: views on opportunities of collabora
- Page 85 and 86: City and the Center also has been s
- Page 87 and 88: • preparation of PINs or PDDs;
- Page 89 and 90: Eng. Gisela Tristán Project Engine
- Page 91 and 92: Construction Forestry Industry gene
- Page 93 and 94: activities will be at the beginning
- Page 95 and 96: projects These developments provide
- Page 97 and 98: Authorities (DNAs), both prerequisi
- Page 99 and 100: Millennium Development Goal 8 as we
- Page 101 and 102: dialogue and cooperation. Therefore
- Page 103 and 104: Draft 1, UNIDO-AUSTRIA 103
- Page 105 and 106: Capacity-building workshops on deve
- Page 107 and 108: Business Council for Sustainable De
- Page 109 and 110: Electric Power Development Energy I
- Page 111 and 112: Impulsora Nacional de Electricidad,
- Page 113 and 114: Ministry of Environment and Natural
- Page 115 and 116: SEMPRA Energy (USA) Exploring CDM o
- Page 117 and 118: World Bank, Protocol Carbon Support
- Page 119 and 120: National Campaign for Saving and In
- Page 121 and 122: ANNEX I-D ENERGY SERVICE COMPANIES
- Page 123 and 124: North-South Trade & Investment, S.A
- Page 125 and 126: Quimycal Techint, S.A. de C.V. quim
- Page 127 and 128: ANNEX I-E ACADEMIC SECTOR DIRECTORY
- Page 129: # INDEPENDENT POWER PRODUCER PERMIT
- Page 133 and 134: Draft 1, UNIDO-AUSTRIA 133
- Page 135 and 136: Sub-step 3 b. Show that the identif
- Page 137 and 138: Draft 1, UNIDO-AUSTRIA 137
- Page 139 and 140: (SARH), 1991-1992. “Leyes Federal