22.10.2014 Views

mexico, support for the development and uptake of - Unido

mexico, support for the development and uptake of - Unido

mexico, support for the development and uptake of - Unido

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20%. At 2003 47, wind generation capacity added only to 2 MW by means <strong>of</strong> 2 stations with 2 units.<br />

At present, wind energy with 2.82 MW, produces only <strong>the</strong> 0.005% <strong>of</strong> <strong>the</strong> generation <strong>for</strong> public<br />

service (CFE, March 2005). But 230 MW are under construction <strong>and</strong> <strong>the</strong> Energy Regulatory<br />

Commission has extended 7 permits to 3 enterprises allowing a generating capacity <strong>of</strong> 750 MW.<br />

Wind stakeholders<br />

CFE<br />

Empresas ESM SA DE CV<br />

Fuerza Eólica del Istmo<br />

Clipper Windpower Development<br />

Company<br />

Cruz Azul S.A. de C.V<br />

Gamesa Energía, Cableados<br />

Industriales<br />

Mitsubishi (Japan)<br />

NEG Micon (Japan)<br />

United Nations Development<br />

Program (UNDP)<br />

Vestas<br />

Activities<br />

1.5 MW wind central at La Venta. 15kW at Isla de Margarita, Baja Cali<strong>for</strong>nia<br />

Sur. A 100 MW project is being develop at <strong>the</strong> Isthmus <strong>of</strong> Tehuantepec,<br />

Oaxaca.<br />

Eólica Santa Catarina, 20 MW wind farm near Monterrey, Mexico.<br />

Wind farm to sell electricity to Cruz Azul S.A. de C.V. First phase <strong>of</strong> 51 MW,<br />

second phase 99 MW. State <strong>of</strong> Oaxaca.<br />

Wind Park, Oaxaca. Project <strong>for</strong>mally within <strong>the</strong> Mexican CDM pipeline, with<br />

Letter <strong>of</strong> No-Objection by <strong>the</strong> Mexican DNA.<br />

Centrals:<br />

Bii Nee Stipa I, 20 MW, December 2005.<br />

Bii Nee Stipa II, 80 MW, December 2006.<br />

Bii Nee Stipa III 100 MW, December 2007<br />

Wind turbines.<br />

Wind turbines.<br />

Action Plan to remove barriers <strong>for</strong> wind energy (testing facilities at <strong>the</strong> Regional<br />

Center <strong>of</strong> Wind Technology at Oaxaca).<br />

NOTE: UNDP Mexico made a Call <strong>for</strong> Express <strong>of</strong> Interest in <strong>the</strong> Installation <strong>of</strong><br />

Wind Turbines at <strong>the</strong> Oaxaca Center <strong>of</strong> Technology, open up to <strong>the</strong> August 12,<br />

2005.<br />

Wind energy at La Ventosa (The Windy), Oaxaca.<br />

O<strong>the</strong>r emissions reduction<br />

• Carbon Sequestration<br />

Emerging activity with a large potential <strong>for</strong> mitigation.<br />

Carbon Sequestration<br />

stakeholders<br />

PEMEX<br />

Activities<br />

Cooperating with <strong>the</strong> Carbon Sequestration Forum, PEMEX is identifying<br />

specific opportunities <strong>of</strong> CO 2 sequestration at oil wells <strong>and</strong> mines geological<br />

<strong>for</strong>mations.<br />

• F-gases mitigation<br />

Emerging activity with potential <strong>for</strong> mitigation. The only existing project is very significant in<br />

terms <strong>of</strong> CO 2 equivalent reduction capacity; this project raises to more than 60% <strong>of</strong> <strong>the</strong> total<br />

expected emission reductions <strong>of</strong> <strong>the</strong> present non-<strong>for</strong>est <strong>of</strong>ficial Mexican pipeline.<br />

F-gases stakeholders<br />

CYDSA-Quimobásicos S. A.<br />

de C. V.<br />

UNICO International<br />

Corporation (Japan)<br />

The DOE is DNV<br />

Activities<br />

Treatment <strong>and</strong> incineration <strong>of</strong> HFC-23. Substance very attractive <strong>for</strong> CDM,<br />

out <strong>of</strong> <strong>the</strong> large factor with respect to CO 2 , despite <strong>the</strong> EU directive on<br />

fluorinated gases (F-gases), that will not see a new emissions trading scheme<br />

established (June 2005). Project <strong>for</strong>mally within <strong>the</strong> Mexican CDM pipeline.<br />

The project has a Letter <strong>of</strong> Approval by <strong>the</strong> Mexican DNA <strong>and</strong> is under<br />

international verification by DNV.<br />

47 CFE Annual Report 2003<br />

Chapter I, UNIDO-AUSTRIA 38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!