24.10.2014 Views

Doppler Weather Radar - METNET - India Meteorological Department

Doppler Weather Radar - METNET - India Meteorological Department

Doppler Weather Radar - METNET - India Meteorological Department

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MONITORING OF DWR SYSTEM<br />

CHAPTER 1<br />

In the process of operation of <strong>Doppler</strong> <strong>Weather</strong> <strong>Radar</strong>, the operator must be familiar with both<br />

hardware and software functions. These two functions could not be exclusively presented<br />

separately in two separate chapters. But, most of the functions regarding hardware are presented<br />

in chapter 1 and software in chapter 3. Initially, safety of personnel and equipment is discussed<br />

in this chapter.<br />

1.0 Safety of personnel, equipment, first aid and emergency rescue<br />

While going to Radome:<br />

Antenna Servo Power and TX Radiation Power are to be put OFF through IRIS MENU<br />

As a safety precaution, the MCB (QF9) & HV in Tx Cabinet is to be switched OFF.<br />

While going to Terrace:<br />

RF Radiation is to be switched OFF through IRIS MENU<br />

1.0.1 Safety Precautions for all the A/C Plants<br />

1. While Switching OFF AC plants trip all associated components of radar which needs<br />

to be operated under optimum temperature.<br />

2. Switch OFF the AC plants/devices.<br />

3. Switch OFF the cooling fan units if not an integrated system with AC compressor.<br />

4. While switching ON the AC plants, the cooling fans will immediately start, wait till the<br />

timer sequence completes in bringing on the Compressor. This indicates the proper<br />

powering ON of AC.<br />

5. Only when <strong>Radar</strong> room temperature is maintained at optimum values (Around 20 deg<br />

C) radar sub-systems are to be switched ON.<br />

1.0.2 Safety precautions for UPS<br />

1. Ensure Battery voltage is full.<br />

2. Check for battery conditions and sufficient airflow.<br />

3. Have a check on the cabinet and room temperature.<br />

4. During Servicing/ Maintenance of UPS-shut down all loads and gradually increase the<br />

load during startup.<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!