Doppler Weather Radar - METNET - India Meteorological Department
Doppler Weather Radar - METNET - India Meteorological Department
Doppler Weather Radar - METNET - India Meteorological Department
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
MONITORING OF DWR SYSTEM<br />
CHAPTER 1<br />
In the process of operation of <strong>Doppler</strong> <strong>Weather</strong> <strong>Radar</strong>, the operator must be familiar with both<br />
hardware and software functions. These two functions could not be exclusively presented<br />
separately in two separate chapters. But, most of the functions regarding hardware are presented<br />
in chapter 1 and software in chapter 3. Initially, safety of personnel and equipment is discussed<br />
in this chapter.<br />
1.0 Safety of personnel, equipment, first aid and emergency rescue<br />
While going to Radome:<br />
Antenna Servo Power and TX Radiation Power are to be put OFF through IRIS MENU<br />
As a safety precaution, the MCB (QF9) & HV in Tx Cabinet is to be switched OFF.<br />
While going to Terrace:<br />
RF Radiation is to be switched OFF through IRIS MENU<br />
1.0.1 Safety Precautions for all the A/C Plants<br />
1. While Switching OFF AC plants trip all associated components of radar which needs<br />
to be operated under optimum temperature.<br />
2. Switch OFF the AC plants/devices.<br />
3. Switch OFF the cooling fan units if not an integrated system with AC compressor.<br />
4. While switching ON the AC plants, the cooling fans will immediately start, wait till the<br />
timer sequence completes in bringing on the Compressor. This indicates the proper<br />
powering ON of AC.<br />
5. Only when <strong>Radar</strong> room temperature is maintained at optimum values (Around 20 deg<br />
C) radar sub-systems are to be switched ON.<br />
1.0.2 Safety precautions for UPS<br />
1. Ensure Battery voltage is full.<br />
2. Check for battery conditions and sufficient airflow.<br />
3. Have a check on the cabinet and room temperature.<br />
4. During Servicing/ Maintenance of UPS-shut down all loads and gradually increase the<br />
load during startup.<br />
1