Doppler Weather Radar - METNET - India Meteorological Department
Doppler Weather Radar - METNET - India Meteorological Department
Doppler Weather Radar - METNET - India Meteorological Department
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Plan Position Indicator – Close range (PPI)<br />
Plan Position Indicator – Surface Rainfall Intensity (SRI)<br />
Plan Position Indicator – 24 Hr Preci. Accumulation<br />
Maximum Reflectivity (MaxZ)<br />
Vertical Wind Profile (VVP2)<br />
Stn = station name (ex : dlh for NEW DELHI)<br />
as ppi_stn.gif<br />
as sri_stn.gif<br />
as pac_stn.gif<br />
as caz_stn.gif<br />
as vp2_stn.gif<br />
1. The renamed images are uploaded to FTP server at DGM (TELECOM), New Delhi<br />
I.P 192.168.2.75, working on latest and faster Virtual Private Network (VPN).<br />
2. The same images are THEN uploaded from FTP server to IMD website server with<br />
I.P 125.21.185.11 at DGM (TELECOM) RTH New Delhi, using a local network<br />
connection.<br />
3. The uploading is done automatically every 10 minutes using VPN and FTP script<br />
files.<br />
1.13. Sequence of actions in case of radar breakdown<br />
Action to be taken by duty asstt. before radar being stopped for maintenance or whenever radar<br />
breakdown occours, or whenever <strong>Radar</strong> is to be stopped TEMPORARILY.<br />
IMPORTANT :<br />
(A). After Shutting down the <strong>Radar</strong> following Procedure has to followed<br />
(i)<br />
Request to Issue “NOTAM” from concerned ATC Duty Officer.<br />
(ii) Put the appropriate <strong>Radar</strong> Stop message on the ftp server (IMD-HQ) which will display this<br />
message in place of <strong>Radar</strong> products on IMD website.<br />
(iii) Regarding the shutting down of radar with TIME, DATE and CAUSE for shutting down the<br />
<strong>Radar</strong>, Immediately, E-mail should be issued to the following concerned authorities/officials.<br />
(i) DDGM(UI)<br />
(ii) SC. (E) In-Charge <strong>Radar</strong> Lab, DDGM (UI)<br />
(iii) DWR In-Charge<br />
(iv) M/s SGS <strong>Weather</strong>, if necessary<br />
(v) Put a note in T- Log regarding the shutting down of radar by mentioning TIME,<br />
DATE and expected time of restarting.<br />
(B). After starting the radar following Procedure has to be followed<br />
(i)<br />
Request to cancel the “ NOTAM” from concerned ATC Duty Officer<br />
(ii) Regarding the starting of radar with TIME and DATE immediate E-mail should be issued to<br />
the following concerned authorities/officials.<br />
(i) DDGM(UI)<br />
24