24.10.2014 Views

Doppler Weather Radar - METNET - India Meteorological Department

Doppler Weather Radar - METNET - India Meteorological Department

Doppler Weather Radar - METNET - India Meteorological Department

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.2.5. A-log book<br />

Details of all administrative problems / information regarding leave, duty arrangement or any<br />

instruction issued over phone by higher officials which are to be communicated to all concerned<br />

officials, for smooth functioning of administration.<br />

2.2.6. Spare parts inventory<br />

Whenever any spare part of <strong>Radar</strong> is replaced/ consumed from the existing stock by M/s SGS or<br />

M/s METSTAR Service Engineers or any other official, information should be recorded in this<br />

register as shown in Table 2.5 along with proper receipt of U/S item which should be taken from<br />

concerned engineer, mentioning the name of the item, Serial. No., Part No. etc. Spares are to be<br />

replenished with new spare by them within 15 Days of replacement time and to be recorded in<br />

the Logbook with all relevant information. An official letter must be issued to concerned party/<br />

firm/ supplier. This register must be checked once in a month i.e. on the first day of every month.<br />

Table 2.5. Spare parts register<br />

S.<br />

No.<br />

Date<br />

Spare<br />

used<br />

With<br />

S.no.<br />

Defective<br />

spare<br />

Received with<br />

S.no.<br />

Replacement received<br />

from SGS with<br />

S.no. and<br />

Date<br />

Opening stock<br />

Balance<br />

Current<br />

Stock<br />

Position<br />

Sign<br />

of<br />

A.M<br />

Sign.<br />

of Dir. DWR<br />

Remarks<br />

2.2.7. Event log book<br />

Whenever any significant event occurred around the station like SQ, DS, TS/TSRA, Hail etc, the<br />

time of commencement, cessation and the period of persistence should be recorded in the<br />

following Table 2.6. Details can also be taken from concerned forecasting office or from<br />

<strong>Department</strong>al Website.<br />

Table 2.6 Event log book<br />

S.<br />

No.<br />

Date<br />

Time<br />

From-To<br />

(UTC)<br />

Type of<br />

<strong>Weather</strong><br />

event<br />

Period<br />

(In<br />

hrs:min)<br />

Folder of events for all types<br />

Of product pictures and<br />

details if any<br />

Sign. Of<br />

D.A<br />

Sign. Of<br />

A.M DWR<br />

Sign. of Dir.<br />

DWR<br />

Remarks<br />

(1). Various related products generated for the above event, time period, date and time of the<br />

event are to be collected and kept in a folder with proper identification. This is to be brought to<br />

the notice of all operators and In charge.<br />

(2). Suppose, the event is TSRA. The concerned product is a WARN product named TS-250 or<br />

TS-150 or TS-100 or THUNDERSTORM or MICROBURST and the raw data used in the<br />

product generation, the product files for these warnings should be archived with backup. The<br />

operator should varify the date and time of the warning and assess the reflectivity values vis a vis<br />

intensity of thunderstorm occurred at the station.<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!