24.10.2014 Views

Doppler Weather Radar - METNET - India Meteorological Department

Doppler Weather Radar - METNET - India Meteorological Department

Doppler Weather Radar - METNET - India Meteorological Department

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.17. How to copy the products from iris server into pen-drive<br />

Mount the pen drive as per the procedure indicared in 3.1 followed by command:<br />

[root@DELHI-WS ~]# cp -rf /home/operator/Desktop/<br />

3.18. How to copy the error log files from rcp8<br />

After getting connected to RCP8 using ssh command, use the following commands.<br />

[operator@DELHI-RCP8]$ cd /usr/iris_data/log<br />

[operator@DELHI-RCP8]$ ls<br />

Listing of log files is displayed. the following copy command is to be given for getting secured<br />

copy of ERROR files into the Desktop folder of the internet computer.<br />

[operator@DELHI-RCP8]$ scp–r /usr/iris_data/log/IRIS_ERROR.LOG internet:<br />

/home/operator/Desktop<br />

3.19. Responsibilities of station in-charge<br />

1 Overall supervision of DWR station.<br />

2 To ensure discipline, punctuality and performance at station. To optimize output from<br />

staff, efficiently manage the available staff in view of severe shortage of staff faced by the<br />

office. He may devise new schemes, rosters, methodologies, and adaptive roles to be<br />

played by officers of various cadres to manage efficiently the operation and maintenance<br />

of radar. He should ensure that proper log books are maintained at the station.<br />

3 To repair minor problems of radar within 2 hours and to report to radar lab in O/o<br />

DDGM(UI) or any other nodal office assigned by them to be responsible for providing<br />

technical support for WSR-98D/S radars.<br />

4 If the Time Of Restoration (TOR), hereafter called as TOR, is expected to be beyond 2<br />

hours, message is to be displayed in the IMD website that radar is under maintenance.<br />

5 To seek the help of other DWR Stations and H.Q in case of difficulty in radar maintenance<br />

due to severity of the problem or non-availability of spares.<br />

6. To prepare various flow charts at block-diagram level for various signal paths like servo<br />

control, Video Generation, various interlocks, etc., using technical manuals and personal<br />

observation of wiring during maintenance. This greatly enhances the speed of servicing<br />

and also helps a newly posted staff members at the station.<br />

7. To liaise with various forecasting offices to increase the utility of DWR Products.<br />

8. To conduct seminars/workshops in order to enhance the working knowledge of staff at the<br />

station and to impart training to forecasters in understanding DWR Products.<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!