scrutiny, as does the provision of access roads and staff accommodation/facilities<br />
during operation, and the provisions made for removal and rehabilitation on<br />
completion. In addition, no mention has been made of security provisions, such as<br />
fencing, which could create significant impact for birds. Pre- and post-development<br />
activities have the potential to be more damaging to the delicate substrate than<br />
operational activities.<br />
Table 11.1: Impacts expected to occur during the proposed development of the SATO-SLC PV<br />
array on the farm Zuurwater near Aggeneys.<br />
Mitigation<br />
Severity* Likelihood**<br />
Activity Nature of Impact 0 (low) – 10 (high)<br />
(see 8<br />
High/Medium/Low<br />
+ve or -ve<br />
below)<br />
Construction impacts<br />
Container delivery Substrate damage -8 High M1<br />
Table assembly Substrate damage -8 High M1<br />
Water supply Servitude disturbance -5 Medium M2<br />
Electricity<br />
connection<br />
Staff facilities on<br />
site<br />
Access/maintenance<br />
management<br />
Servitude<br />
management<br />
Water management<br />
Servitude disturbance -5 Medium M2<br />
Substrate<br />
transformation<br />
Operational impacts<br />
-8 High M3<br />
Substrate damage -5 Medium M1<br />
Loss of habitat -3 Low M2<br />
Water wastage,<br />
contamination risk<br />
-3 Low M4<br />
Faunal interference Soiling/shorting/shading ±2 Low M5<br />
Vegetation<br />
management<br />
Material<br />
removal/recycling<br />
Control of plant<br />
diversity/structure<br />
Closure impacts<br />
±5 Medium M6<br />
Substrate damage -5 Medium M1<br />
Substrate repair Substrate damage -5 Medium M1<br />