copy attested by Executive Engineer <strong>Work</strong>s Division, ZILLA PARISHAD Washim to be<br />

Submitted as per the tender Schedule).<br />

1.4.2 Scanned copy <strong>of</strong> Valid certificate as a Registered Contractor with the Government <strong>of</strong><br />

Maharashtra in appropriate class (attested by Deputy Engineer Sub Division z.p ).<br />

1.4.3 Scanned copy <strong>of</strong> valid VAT registration certificate from Maharashtra State Sale Tax Department<br />

duly attested by Deputy Engineer Sub Division z.p (Maharashtra Value Added Tax Act<br />

2005)<br />

1.4.4 Scanned copy <strong>of</strong> list <strong>of</strong> Machinery and plants immediately available with the tenderer for use on<br />

this work and list <strong>of</strong> machinery proposed to be utilized on this work.<br />

1.4.5 Scanned copy <strong>of</strong> pro<strong>of</strong> <strong>of</strong> appointment <strong>of</strong> employees<br />

1.4.6 Scanned copy <strong>of</strong> details <strong>of</strong> work done during last three years with the value <strong>of</strong> work unfinished<br />

1.4.7 Noterised Joint Venture if applicable<br />

1.4.8 Scanned copy <strong>of</strong> certified Attested copy <strong>of</strong> Registered Partnership Deed / Memorandum <strong>of</strong> Article <strong>of</strong><br />

Association, as the case may be if the tenderer is a partnership firm or joint venture company if<br />

applicable. The Certificate shall be attested Sub Division z.p Deputy Engineer.<br />

1.4.9 Power <strong>of</strong> Attorney on behalf <strong>of</strong> firm issued in the name <strong>of</strong> persons authorised to sign agreements, bill,<br />

etc. and collect cheques from department for the work done. (Attested by Deputy Engineer Sub<br />

Division z.p.)<br />

Even though the bidders meet the above qualifying criteria, they are subjected to be disqualified if they<br />

have made misleading or false representation in the forms statement and attachments submitted as<br />

pro<strong>of</strong> <strong>of</strong> the qualification requirements and / or record <strong>of</strong> post performance such as abandoning the<br />

works, not properly completing the contract, in ordinate delays in completion litigation history or<br />

financial failures etc.<br />

1.5 ENVELOPE No. 2 TENDER (FINANCIAL BID)<br />

The second envelope “Envelope No. 2” shall contain only the main tender including the<br />

Common Set <strong>of</strong> Conditions / Deviation issued by the Department after the pre-tender<br />

Conference. A tender submitted without this would be considered as invalid.<br />

The Tenderer should quote his <strong>of</strong>fer duly signed in terms <strong>of</strong> percentage <strong>of</strong> estimated rates at the<br />

appropriate place <strong>of</strong> tender documents to be submitted only in Envelope No. 2 He should not<br />

quote his <strong>of</strong>fer any where directly or indirectly in Envelope No. 1. The contractor shall quote for<br />

the work as per details given in the main tender and also based on the detailed set <strong>of</strong> conditions<br />

issued / Additional stipulations made by the Department as informed to him by a letter from<br />

Chief Engineer / Superintending Engineer/ Executive Engineer/ Deputy Engineer, IDW, NRHM<br />

Cell, Z P Akola after Pre-Tender Conference. His tender shall be unconditional.<br />

1.6 SUBMISSION OF TENDER: -<br />