(2) Mild Steel / H.Y.S.D./T.M.T Steel<br />
High Yield Strength Cold Twisted deformed bars /TMT bars shall comply with IS: 1786 and<br />
"Mild Steel" bars shall comply with IS: 432.<br />
All reinforcement shall be free from rust loose mill scale or coats <strong>of</strong> Oil, Paints etc. which may<br />
destroy bond and protected by anti corrosive treatment before placing in position for concreting.<br />
The agency should use the steel manufactured by the Main Producers only. No re-rolled steel<br />
shall be incorporated in the work.<br />
3) II Class Burnt Brick<br />
II nd Class burnt clay brick without frog shall not be accepted.in any case. The brick with frog<br />
10 to 20 mm deep on one <strong>of</strong> its side only shall only be accepted. The diameter <strong>of</strong> the bricks<br />
shall be strictly in accordance with the Indian standard 12894 2002 .If the size <strong>of</strong> bricks is<br />
found to be more than that <strong>of</strong> specified in the item <strong>of</strong> work, the rate will be proportionally<br />
reduced because <strong>of</strong> reduced joints and labour .The size <strong>of</strong> bricks smaller than the specified in<br />
the item <strong>of</strong> work shall not be accepted. The sample <strong>of</strong> bricks shall be got approved from the<br />
Engineer -In -charge before using the same in the work. It shall be the responsibility <strong>of</strong> the<br />
contractor to got tested the sample <strong>of</strong> bricks for the physical charcterstatics from the approved<br />
laboratory and submit the test report to be Engineer in charge before using the bricks in the<br />
work<br />
(4) Rejection <strong>of</strong> Materials not conforming to specification:<br />
Any Stock or batch <strong>of</strong> material(s) <strong>of</strong> which sample(s) does not confirm to the prescribed<br />
test and quality, shall be rejected by the Engineer or his representative and such materials shall<br />
be removed from site by the contractor at his own cost. Such rejected materials shall not be<br />
made acceptable by any modifications.<br />
Materials not corresponding in character and quality with approved samples will be rejected by<br />
the Engineer or his representative and shall be removed from the site immediately and will not<br />
be allowed to use for any component <strong>of</strong> work.<br />